Rully Septian
Universitas Negeri Padang

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

ANALISIS KESTABILAN LERENG JALAN TAMBANG DI PT. SUMBAR CALCIUM PRATAMA JORONG ATAS HALABAN, NAGARI HALABAN, KECAMATAN LAREH SAGO HALABAN, KABUPATEN LIMA PULUH KOTA, PROVINSI SUMATERA BARAT Rully Septian; Bambang Heriyadi; Heri Prabowo
Journals Mining Engineering : Bina Tambang Vol 3, No 2 (2018): Journals Mining Engineering: Bina Tambang
Publisher : Departemen Teknik Pertambangan FT UNP

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (860.622 KB) | DOI: 10.24036/bt.v3i2.10113

Abstract

mining area. Planning of the slope geometry will be used by Bishop Simplified and Hoek and Bray methods.Initial data Clay: Unit Wight (γ) = 19.67 kN / m3, Cohesion (c ') = 32.17 kN/ m2 and internal angle (φ') = 39.11 °. The initial slope height is 14.543 meters and overall angle of the slope is 51 °.Geometry of slope recommendation: 1. Bishop Simplified method of saturated condition FK 0.984 witch mean slope is insecurity, reduction of slope angle from 51 ° to 42 °, FK 1,324 slope in safe state. 2. Method Hoek and Bray saturated conditions FK 1.25 Unsafe slope, slope angle from 51 ° to 42 °, then FK 1.41 slope in safe condition.Keywords: initial geometry, bishop simplified, hoek and bray, security factor