Riri Rahmahwati Joni
Universitas Negeri Padang

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analysis Of JHA, JSA and Management K3 At KIP 16 Bangka Ocean Mining Units PT Timah (Persero) Tbk Province Bangka Belitung Islands Riri Rahmahwati Joni; Rusli HAR; Heri Prabowo
Journals Mining Engineering : Bina Tambang Vol 3, No 1 (2018): Journals Mining Engineering: Bina Tambang
Publisher : Departemen Teknik Pertambangan FT UNP

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (800.365 KB) | DOI: 10.24036/bt.v3i1.9070

Abstract

This research discuss about safety and health occupational control inBangka Ocean KIP Timah 16 Units using some risk management methodes. Themethodes are Job Hazard Analysis (JHA), Job Safety Analysis (JSA), and HazardIdentification Risk Assesment Determining Control (HIRADC). Purpose of theresearch is to explain safety and health occupational in KIP Timah 16 Unit it isfor get the improvement of productivity work, production, welfare andcomfortability workers and achievment of zero accident.The type pf the research is descriptive. There are two data had collected.They are primary and secondery data. Primary data get from interview with theemployees and secondary data get from K3 documents in thecenter company ofPT. Timah UPLB and KIP 16.Based on result of research can get some conclutions. First, explain safetyand health occupational system. Second, the implementation formula of FR, SRand IR to count total accident that lost from day work, percentage of accident fora month. Third, to use methode JHA, JSA and HIRADC for identification andcontrol occupational accident. And last, to arrange new SOP from analysis resultJHA, JSA, HIRADC and earlier SOP.
PIT Design Area 206 Ha at PT Semen Padang Indarung Riri Rahmahwati Joni; Aldri Frinaldi; Rembrandt Rembrandt; Dasman Lanin; Genius Umar
Science and Environmental Journal for Postgraduate Vol 4 No 2 (2022): Science and Environmental Journals for Postgraduate (SENJOp)
Publisher : Pascasarjana, Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/senjop.v5i1.150

Abstract

PT. Semen Padang is a mining company engaged in quarry (limestone) mining. The company is located in Bukit Karang Putih – Indarung, Padang City. Mining in this company uses the Type Side Hill Quarry system. For production in the 206 Ha mining area using a combination of mechanical devices in the form of Excavators and Dump Trucks. With supporting tools in the form of a D9R Bulldozer and a GC-02 Motor Grader. The target of this activity is to optimize mining production in the 206 Ha pit area. Efforts were made to optimize mining production in the Exit Area and PIT Limit from 2014 – 2016 by combining Excavator and Dump Truck mechanical devices to the crusher loading area with a volume of 24,872,835 tons, 28,304,505 tons and 26,029,609 tons. Whereas in 2017 – 2020 only the PIT Limit area will carry out mining production, this is because the reserves in the Existing area have run out. PIT Limit production from 2017 – 2020 is 21,864,874 tons, 20,981,407 tons, 20,831,837 tons, and 20,662,775 tons.