Apri Yuliani
Unknown Affiliation

Published : 13 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 13 Documents
Search

Kajian Biaya Penanganan Petikemas Melalui Terminal Petikemas Tanjung Priok Apri Yuliani
Warta Penelitian Perhubungan Vol. 23 No. 1 (2011): Warta Penelitian Perhubungan
Publisher : Sekretariat Badan Penelitian dan Pengembangan Perhubungan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25104/warlit.v23i1.1052

Abstract

The tremendeous intensity of export/import activity using containers in Indonesia should be an opportunity to support economic development and improve public's welfare. In fact, it was hampered by the high logistics costs. This phenomenon's correctly proven by a periodic national logistics performance survey conducted by The World Bank, Logistics Performance Index (LPI). In 2010, World Bank ranked Indonesia in position 75 out of 155 countries, which is one of these performance considerations is the cost of shipping, that has put Indonesia at rank 80. Referring to the ESCAP model port tariff structure, the port tariff structure of Tg. Priok's divided into four sections. They are navigation, berth, cargo operations and other business. Compared to Port of Melbourne's tariff, Pelabuhan Tg. Priok even regulates a lower rate of tariff Based on interviews and observations, the detenninant factors causing high cost of logistics are: (i) illegal fees, mostly caused by inadequacy of infrastructure, red-tape bureaucracy, insufficient and less-regulated standard operating procedures, the absence of rotation mechanism and exclusive authority without supervision; (ii) the surcharge; and (iii) induced cost of unpredictability delivery process.Keywords : Handling costs, Tariff, Container
Evaluasi Penerapan Next Generation Terminal Management System (NGEN) Dalam Mendukung Kelancaran Penanganan Petikemas Pada PT. JICT di Pelabuhan Tg. Priok Apri Yuliani
Warta Penelitian Perhubungan Vol. 23 No. 4 (2011): Warta Penelitian Perhubungan
Publisher : Sekretariat Badan Penelitian dan Pengembangan Perhubungan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25104/warlit.v23i4.1090

Abstract

The increasing throughput significantly in the Port of Tg. Priok should be well-balanced by terminal's efforts to improve facility, management, systems and information technology. Otherwise, it will bring a negative impact to the container handling performance which will influence the users' satisfaction value. Therefore, since 1 September 2009, PT. JICT has applied the Next Generation Tenninal Management System (nGen) in container handling process. The purpose of this study is to evaluate the effectiveness of the implementation of nGen in supporting the container handling process. The method used is a paired t test, to evaluate the container handling performance between pre-implementation and post implementation of nGen in PT. JICT. The advantages of nGen could bring a positive impact to the effectiveness of container handling. It doesn't only come to JICT's operator but also the users, such as Shipping Line, Freight Fonuarding, and EMKL. Tiw availability of real time data effectively improves the effectiveness of receiving and delivery process. Based on data analysis, there's a significant correlation (55,9%) for crane's average performances between pre-implementation and post implementation of nGen. 44J % is influenced by other factors such as : operator's competency, equipment's condition, ship's and yard's condition. The implementation of nGen could improve the crane's perfonnance around 0)41 to 2,059 moves. Meanwhile, there's no correlation for YOR average between pre-implementation and post implementation of nGen.Keywords : nGen, perfonnance, container terminal
Evaluasi Pelabuhan Mesuji Untuk Masuk Dalam Trayek Tol Laut Apri Yuliani
Jurnal Penelitian Transportasi Laut Vol. 20 No. 1 (2018): Jurnal Penelitian Transportasi Laut
Publisher : Sekretariat Badan Kebijakan Transportasi, Formerly by Puslitbang Transportasi Laut, Sungai, Danau, dan Penyeberangan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25104/transla.v20i1.796

Abstract

Rencana pembangunan Pelabuhan Mesuji di Kabupaten Mesuji, Provinsi Lampung bertujuan untuk mendukung kelancaran distribusi barang dari Pulau Sumatera menuju Jakarta melalui Pelabuhan Sunda Kelapa, atau sebaliknya. Dengan keberadaan Pelabuhan Mesuji, waktu tempuh Kabupaten Mesuji – Jakarta hanya 5 jam, lebih cepat 10 jam dibandingkan dengan moda transportasi darat melalui Pelabuhan Bakauheni. Pelabuhan Mesuji diusulkan untuk masuk ke dalam trayek tol laut. Untuk menjadikan Pelabuhan Mesuji layak disinggahi kapal tol laut, perlu dilakukan analisis kelayakan yang meliputi analisis prediksi demand, analisis prediksi supply, analisis kinerja pelayanan transportasi saat ini dan analisis kebutuhan fasilitas pelabuhan di masa mendatang. Berdasarkan hasil pengolahan data, potensi bongkar dan muat di Pelabuhan Mesuji diperkirakan dapat mencapai 37.428 ton pada tahun 2017 dan sekitar 76.466 ton pada tahun 2028. Ukuran kapal maksimal yang dapat dilayani Pelabuhan Mesuji yaitu berat kotor 1,000 DWT dan panjang kapal 58 meter. Berdasarkan hasil pengolahan data, Pelabuhan Mesuji lebih tepat dimasukkan ke dalam trayek kapal perintis daripada trayek tol laut.