Alfa Taras Bulba
Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

FAKTOR DOMINAN PENENTUAN PEMENANG LELANG PADA SISTEM GUGUR DI KOTA BANDA ACEH Alfa Taras Bulba; Muammar Zaki Fahlewi
JURNAL TEKNIK SIPIL Vol 3, No 2 (2014): Volume 3, Nomor 2, Januari 2014
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Tender stage is a process to be appointed  contractor for construction project implementation. Bidding method is used by sistem gugur that divided into administration, technic and prices evaluation. The purposed of research is to identify dominan factors that influence to contractor selection between 2010 until 2013 at Banda Aceh. Data is collected from contractor who is in charges likes Project Manager, Engineer and ULP as a parties from owner to selecting contractor. Dominan factor variabel is measure by Linkert scale and Guttman scale also to measured relationship each factors in deciced variable. Data is showedcontractor fail the bid because administration evaluation 13,25%, technich evaluation 8,55%, price evaluation 7,69% and cancel of bid 70,79%. Reability test result is cornbach alpha0,80320,6. Dominan factor is rated from organisation factor such as communication, documentation and coordination 95,83%, human resources 81,11%, financial factor 80,37%,machinery and tools 74,81% and experiences factor 56,67%. This research result can be input to the parties are involved to be tender stage implementation.
STUDI NILAI PRODUKTIVITAS PEKERJAAN PONDASI BORED PILE Mubarak Mubarak; Alfa Taras Bulba; Mega Yunita
JURNAL TEKNIK SIPIL Vol 3, No 2 (2014): Volume 3, Nomor 2, Januari 2014
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The success of a construction project is determined by a number of factors. One of the factors that play a direct role is a job  productivity. Productivity can be expressed as the ability to complete a job within a certain time. The productivity is directly determined by the amount of the volume of work, the amount of labor/equipment, and implementation time. The larger the value of productivity, the greater the chance of a job can be completed by the target date. Therefor, this study aimed to assess the value of productivity on the bored pile foundation work. The study was conducted at the Project Tanjung Priok Access Road Construction Project (Phase I) Package 2, Section E-2, Cilincing - Jampea, North Jakarta. The study was  initiated with field observations, by observing the completion of all stages of the process, andshall record the amount of labor / equipment and the turnaround time at each stage of thework. The volume of work is analyzed based on the design drawings. Productivity values for each phase of implementation of the work are: 1) the work of pre boring 46.71 m³/hr; 2) installation of casing 115.69 m/hr; 3) drilling by bucket 9.74 m³/hr; 4) ry by the bucket 81.70 m³/hr; 5) Cleaning by airlift 10.81 m³/hr; 6) test Koden 313.05 m/hr; 7) nstallation of rebar30.37 m/hr; 8) tremie pipe fitting 88.11 m/hr; and 9) casting concrete 89.56 m³/hr. Overall, the value of bored pile foundation work productivity is 3.14 m³/hr.