This Author published in this journals
All Journal PILAR
Metri Harissa
PT. Hutama Karya (Persero) Divisi Pengembangan Jalan Tol

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

PERBANDINGAN METODE PEMBEBANAN VAKUM DENGAN PRAPEMBEBANAN UNTUK MEMPERCEPAT PROSES KONSOLIDASI ( 17-23 ) Metri Harissa; Mutiara FitriWahyu Ningrum; Sukarman Sukarman; Ika Sulianti
PILAR Vol. 13 No. 2 (2018): Pilar: September 2018
Publisher : Politeknik Negeri Sriwijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Palembang Toll Development Project - Simpang Indralaya is built on swamp land. The subgrade of this road is soft clay soil that has low bearing capacity of soil. Low bearing capacity of the soil will cause severe damage to the pavement on the soil heap. Therefore it is necessary to strengthen the base soil to be able to withstand and avoid sliding because it does not decrease.In this final project, there will be comparative analysis of 2 (two) alternatives to improve the embankment in reaching the same degree of consolidation. The first alternative is traditional preloading method and second alternative is vacuum preloading method.From the calculation results, obtained by using vacuum preloading method, the time required to achieve the same degree of consolidation can be shorter than the traditional preloading method.