This Author published in this journals
All Journal Jurnal Titra
Felicia Yanto
Industrial Engineering Department, Petra Christian University

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Identifikasi Keterlambatan Pengiriman Produk di PT X pada Departemen Material Preparation Control Felicia Yanto
Jurnal Titra Vol 6, No 2 (2018): Jurnal Titra vol. 6 No. 2, Juli 2018
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (403.349 KB)

Abstract

PT X is a plastic packaging compay. Delay problem at PT X reach 31.4% of total delivery. The purpose of this research is to find the cause of the delay that happened in Material Preparation Control Department at PT X. The causes of the delay classified into two, there are start and process late. The root cause searched by 5-Whys method. The root causes of the late are human eror, machine capacity different between MPC and IMM-EBM, and production faltered. The proposed solutions are periodically checking and MPC production process calculated by Planner is adjusted to the capacity of IMM and EBM machine.