This Author published in this journals
All Journal Jurnal Titra
Michael Alexander Wijaya
Jurusan Teknik Industri Universitas Kristen Petra

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Designing Work Standards to Reduce Lead Time Delivery using Value Stream Mapping Method: A Case Study Michael Alexander Wijaya
Jurnal Titra Vol 4, No 2 (2016): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1647.218 KB)

Abstract

PT. Samando experienced problems in terms of delivery of goods the expedition. Delay means delivery of goods leaving exceeds the specified time limit. The level of delays in PT. Samando during 2015 amounted to 64.94%. The absence of proper work standards resulted in the delays on the internal processes that lead to delay in delivery. Value stream mapping method used to solve problems that occur in the PT. Samando. Value stream mapping consists of two phases: current state phase and future state phase. Current state phase is a picture of the beginning of all activities which could further identified their waste. The current state total lead time is 6.891,33 seconds. Future state phase is a condition subsequent to the improvement of the waste that have been identified previously. There are six waste, which are four transportation waste and two waiting waste. The results of the future state condition is 3.916,32 seconds with three types of SOP (Standard Operating Procedures) and two relayout.