This Author published in this journals
All Journal Jurnal Titra
Rexy Anderson Isach
Industrial Engineering Department, Petra Christian University, Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Evaluasi Beban Kerja Teknisi Mesin, Teknisi MTP dan Admin Departemen Injection Molding Pada PT X Rexy Anderson Isach
Jurnal Titra Vol 8, No 1 (2020): Volume 8 No 1
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT X is a multinational company that produces brands, both locally and globally.  PT X produces face powder, lipstick, eye shadow and facial wash packages.  The company has a human resource problem, which is an imbalance of workers performance.  The imbalance that occurs in the injection molding department is caused by some workers who seem to have less workloads than other workers and less efficient activities carried out.  The purpose of this study is to evaluate the workload of machine technicians, MTP technicians and administrators by using DILO method.  The DILO method is carried out in 3 stages which are value added analysis, time composition and individual workload analysis.  The normal individual workloads is around 77.25% - 83.8%.  After calculating the workloads, it is found that 8 out of 12 machine technicians, 2 MTP technicians and 2 admins still have workloads that are not within normal range. A machine technician and 2 admins have workloads above normal range and only 3 machine technicians have workloads within normal range. Eleven suggestions are made, and if they are implemented, it will reduce the percentage of non value added and value added activities around 0.14% to 10.95%.