Penjadwalan Mesin dengan Menggunakan Algoritma Pembangkitan Jadwal Aktif dan Algoritma Penjadwalan Non-Delay untuk Produk Hydrotiller dan Hammermil pada CV. Cherry Sarana Agro Prima Fithri; Fitri Ramawinta
Jurnal Optimasi Sistem Industri Vol. 12 No. 2 (2013): Published in 1st October 2013
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (455.749 KB) | DOI: 10.25077/josi.v12.n2.p377-399.2013

Abstract

Fulfillment of all demands of consumers who come to the product is one thing that always wanted to be achieved by a company. These requests are not independent of the company's ability to manufacture certain products. CV Cherry Sarana Agro manufactures a wide range of agricultural equipment, one of which is the product hydrotiller and hammermil. Demand for both products are always in large numbers for each period, however, the company could not meet the entire demand. One of the main factors that led this small company's production capacity for these two products is not optimal scheduling of machines made by companies, causing many to be a queue on a particular machine so that the total process operating time becomes very large. Scheduling method is used to optimize the scheduling of machines working on the report of this practice is actively scheduling method and the method of non-delay scheduling. The data needed to perform scheduling with both of these methods is the data used machines, data processing operations and data processing time of operation. With these three data, can be compared to the actual scheduling done by the company with the scheduling is done using active scheduling method and the method of non-delay scheduling. The most optimal scheduling is obtained after comparing the three methods used are scheduling using the non-delay scheduling. This method was chosen because the resulting make span is much smaller than the two other methods. This method is well applied in the company because in addition to reducing the total processing time, can also increase production capacity, so that all requests can be met.Keywords: Active schedulling method, non-delay schedulling method, makespan, hydrotiller, hammermil