Claim Missing Document
Check
Articles

Found 1 Documents
Search

Penjadwalan Produksi dengan Metode Johnson dan Heuristic untuk Meminimasi Makespan, Total Flow Time, serta Idle Time Dyah Retno Purwatiningsih; Hima Khusnita
Jurnal Teknik Industri Vol. 2 No. 1 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No1.19-26

Abstract

Product scheduling system that used by PT Berjaya Sekawanindo for this time, only concidering one purpose criteria for product scheduling is how to finishing all of demand fastest. With only concidering one urpose criteria, cause there are another criterias which neglectfully.