This Author published in this journals
All Journal Foristek
Claim Missing Document
Check
Articles

Found 1 Documents
Search

PROYEKSI KEBUTUHAN DAYA LISTRIK DI PROPINSI SULAWESI TENGAH TAHUN 2007-2020 Tadjudin Hamdhani
Foristek Vol. 1 No. 1 (2011): Foristek
Publisher : Foristek

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The study is devoted to forecast electrical energy demand from 2007 to 2020, so lack of energy can be anticipated. The study was conducted in Palu, province of Central Sulawesi. The data is analyzed using linear regression. The result showed that the increasing of load in 2007 is very significant with peak load reached 120,6 MW. In 2020 the peak load reached 196.2 MW.