Prawira Ridzki Utama
FST Universitas Al Azhar Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

ANALISA HUMAN ERROR PROBABILITY MENGGUNAKAN METODE HEART (HUMAN ERROR ASSESSMENT AND REDUCTION TECHNIQUE) PADA OPERATOR KONVEKSI CV. 913 PRODUCTION Prawira Ridzki Utama
Operations Excellence: Journal of Applied Industrial Engineering Vol 10, No 1, (2018): OE Maret 2018
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

CV. 913 Production is convection in the Bekasi, West Java. This convection is producing jacket for men. The process of production in this convection, almost entirely made manually. Based on problems that often occurs in production process it caused by factors human error. Hence the CV.913 Production must have a high level of reliability. To deal with the problems of human error, a method that can be used is method of HEART (Human Assessment of Human Error). HEART method is the one of reduction technique in counting the probability of human error. From the settlement problem in CV. 913 Production by using the HEART method. So can be concluded that production activities that have bigger probability value of human error there are the process of designing and cutting raw materials. On both the process obtained probability value is 0.0104. The solution can researcher suggestions are to reduce the value of the error by operator was to set standards an operation these clearly and make one pattern which are permanent not to constantly changing.