Siti Hardiyati
Jurusan Teknik Sipil FT. UNDIP Jl. Prof. Soedarto SH., Tembalang Semarang 50275

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

EVALUASI DAN PERENCANAAN KEMBALI BENDUNG SAPON Dyah Wahyu Apriani; Fajar Nugroho Utomo; Sri Eko Wahyuni; Siti Hardiyati
Jurnal Karya Teknik Sipil Volume 2, Nomor 1, Tahun 2013
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (340.298 KB)

Abstract

Sapon weir, which located at Kulon Progo, Yogyakarta, is a hydraulic structure that its water supply is from Progo river. Sapon weir are used to flow through ± 1850 ha rice field area, from ± 2250 ha before at 2,3 m3/sec, and to fulfill the water needs in 4 sub districts at 0,2 m3/sec. The increasing function of Sapon weir from only covering the irrigation needs, to fulfilling the water needs it is the implementation of the regulation no 8 year 2005 about water resources. The analysis of flood design using Haspers Metod, FSR Jawa-Sumatera, HSS Nakayasu, HSS Gama 1 with flood design comparation from Pasing Capacity Metod that has 1123,96 m3/sec of flood discharge in hundred year periode (Q100). The design of Sapon weir consists of main dam, complement buildings and requirement water supply pump for 1383,97 m3/sec of flood discharge hundred years period. The differences of weir design change the weir dimensions and the complement buildings.
ANALISA DAN INVESTIGASI LONGSORAN JEMBATAN TAMBAKBOYO PADA RUAS JALAN LINGKAR AMBARAWA Rangga Aditya Pratama; Moga Narayudha; Siti Hardiyati
Jurnal Karya Teknik Sipil Volume 2, Nomor 2, Tahun 2013
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (717.035 KB)

Abstract

Ambarawa is a small town in Central Java. The location is between the two major cities of Semarang and Yogyakarta. In the development of an increase in the density of traffic on the road Theater - MGR Soegijaapranata Ambarawa traffic density is due to the market Ambarawa have very solid activity around it and the narrowing of the road in front of the market. Therefore the construction of the ring road Ambarawa done. In the process of the construction of the ring road is a problem with the bridge construction Tambakboyo. The problem is the soil avalanche oprit pile on one side of the abutment. To address the problems with the structure of the solution taken Millipedes. The solution was taken because the original soil conditions where there is very unstable old former underground streams that support native land oprit heap. Oprit caused landslides on a sloping abutments, so it needs to be jacked back into position. The slope is not going to happen because the abutment unstable. To handle oprit While, based on the analysis and calculations, selected spoon piles with a diameter of 45 cm in the construction of the bridge 120 meters long millipede. Spoon piles Depth varies from 15 meters to 19 meters. To bind each pile pilecap are associated with beams. With the improvement in oprit expected to provide stability for the abutment and landslides again.