Langlang Adi Pratama
Jurusan Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto, SH., Tembalang, Semarang 50275

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

UPAYA MENGURANGI ANGKUTAN SEDIMEN SUNGAI GARANG KOTA SEMARANG Langlang Adi Pratama; Susilowati Susilowati; Suseno Darsono; Dwi Kurniani
Jurnal Karya Teknik Sipil Volume 3, Nomor 2, Tahun 2014
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (247.456 KB)

Abstract

West floodway Semarang city is one of the infrastructure for manage flood in Garang Stream. Because of sedimentation in Garang stream, decrease flow capacity. Check Dam construction is made beam for help reduce river slope so can decrease water velocity and reduce capacity sediment delivery in Garang stream. Build check dam will reduce sedimentation in downstream Garang river. From calculation fall of rain in years with Thiessen method then do hidrology analyze using HEC-HMS and get rate of flood 100 years in location in the amount of 386.9 m3/det. Analyze using USLE method get erotion number amount 1.85 mm/year (32.01 ton/ha/year), and form erotion analyze get number of sedimentation amount 2.677 ton/ha/year. Location of Pramuka check dam construction is in downstream Pramuka bridge, Pudak Payung, Semarang. With planning as following: high physical effective main dam is 4 m, depth of foundation is 1.3 m, material for buil check dam is form river rocks. Implementation check dam works need 6 month and cost two billion eight hundred ninety five thousands million rupiah(Rp 2,895,000,000).