PERANCANGAN BENDUNG GERAK KARANGTALUN DI KABUPATEN KULON PROGO, YOGYAKARTA Garyas Praja Siswadi; Saktyianto Ajinugroho; Suseno Darsono; Sugiyanto Sugiyanto
Jurnal Karya Teknik Sipil Volume 2, Nomor 2, Tahun 2013
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1007.247 KB)

Abstract

In addition to the construction of an alternative form of water reservoirs, to tackle the problem at the Weirs Karangtalun can also be by way of construction of the barrage. The reason for the need for the construction of the dam movement emerged based on the survey results, which show that Karangtalun weir downstream conditions are now damaged due deggredasi riverbed downstream. Weir crest had already suffered some damage due to collision damage to the stone. It is feared that one day the dam will collapse.Barrage to capture the motion of the water to drain Progo river can be more time in the count because of the barrage that comes w ith taking the doors and door rinse. raw water needs in the catchemet area Progo 2 of irrigation kalibawang and mataram, flood discharge plan is designed with 100-year return period of 1157 m3/sec.Barrage height of 10 m. Weir is equipped with radial main door, stilling basin using the threshold type width of 35 m. Construction of barrage to cost about 222 billion and a plan of implementation 40 weeks.
PERENCANAAN BENDUNGAN SALAK KABUPATEN KULON PROGO, YOGYAKARTA Aprilia Cheni Hermawati; Arinda Puspitaningtyas; Suseno Darsono; Sugiyanto Sugiyanto
Jurnal Karya Teknik Sipil Volume 2, Nomor 1, Tahun 2013
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (433.978 KB)

Abstract

Increasement of water demand that caused from the population increasement and land use change over at Progo Basin, inversely with water supply to that area. So that, the solution to conquer the problem is to build a water reservoir. One of the alternative is Salak Dam which located at Kalibawang District, Kulon Progo Regency, Yogyakarta. Salak Dam is a vertical core earthfill dam, which built on Salak River with 9.4 km2 of catchment area. This dam aims to fulfill public water supply and watering three fields area and designed with 100 years of return period with inflow discharge valued 46.9 m3/second. Salak Dam designed 48.5 meters of height, with 18.5 million cubic meters of capacity. This dam equipped with 2.2 meters of diameter outlet pipe, Ogee type of spillway with 20 meters of width, and USBR III of stilling basin. Construction of Salak Dam costs around 450 billion Rupiahs and scheduled for 39 weeks.
PERENCANAAN BENDUNGAN MANONJAYA KABUPATEN TASIKMALAYA, JAWA BARAT Muhammad Qorib Hidayat; Kalih Amanis Shofa; Sri Eko Wahyuni; Suseno Darsono
Jurnal Karya Teknik Sipil Volume 2, Nomor 3, Tahun 2013
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (482.588 KB)

Abstract

Increasing water demand is caused of increasing population at Tasimalaya Regency, inversely with water supply to that area. This problem is solved by constructing a reservoir located in Tasikmalaya regency, West Java that is the Manonjaya Dam. Manonjaya Dam is a earthfill dam with a vertical core which is built at Citanduy River with 590.422 km2 of catchment area. This aims of dam to fulfill public water supply and irrigation at Tasimalaya Regency. Manonjaya Dam is designed with 100 years of return period with inflow discharge valued 513.9 m3/second. Manonjaya Dam is designed 23.5 meters of height, with 3,9 million cubic meters of capacity. The dam has equipped with 3,5 meters of diameter outlet pipe, spillway with 30 meters of width, and USBR III of  stilling basin. Construction cost of Manonjaya Dam is around 154 billion Rupiahs with scheduled for 33 weeks.