priyo Nugroho P.
Jurusan Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto, SH., Tembalang, Semarang 50275

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

PERENCANAAN SISTEM DRAINASE KALI KENDAL Sukma Adji Nugrahedi; Adi Saputra; Suripin Suripin; priyo Nugroho P.
Jurnal Karya Teknik Sipil Volume 3, Nomor 4, Tahun 2014
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (620.366 KB)

Abstract

Kendal river is always overtopped during rainy day, certainly in central city and densely populated area. The flood duration around 4-8 hours with 40-60 cm depth caused the secondary channel can’t flow into the primary channel. The problem of flooding caused by the capacity of Kendal River is decreasing. Base on that condition, this final project was aimed to redesign Kendal River system based on capacity and functionality. The first step on redesign drainage system is hidrology analysis for determining a flood discharge, analysis hidrolic analysis by HEC-RAS software to evaluate the capacity exsisting channel. The conclution of the evaluation result is the maximum channel capacity could be increased to 10 years discharge flood only (34,94 m3/s). Increase the capasity of the trapezium channel by enlarge a basis channel along 10 m at Kendal River (11,750 m), include the revetment construction (2,300 m) on P.5+050 – P.10, P.11 - P.12, P.13+050 - P.15, P.44+050 - P.45+050, P.65 - P.80. Anchored wall construction decided as a retaining wall for a rectangular channel type (2,050 m) at P.24 - P.4+050. And then, for accomodate 25 years flood discharge (45,43 m3/s) need 7 ha retention pond. Total cost is Rp. 63,847,420,000,00 for 10 years discharge desain.
PERENCANAAN DERMAGA PELABUHAN TANJUNG BONANG REMBANG Rizqi Maulana Wijaya; Purwanto Purwanto; Priyo Nugroho P.
Jurnal Karya Teknik Sipil Volume 3, Nomor 4, Tahun 2014
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1286.03 KB)

Abstract

Jetty Tanjung Bonang Rembang Port located on the coast of Sendangmulyo Village, Sluke Sub District, Rembang District, Central Java Province. This jetty construction is aiming to serve 10,000 DWT general cargo ship and to maximize distribute goods in the area of Rembang and surroundings. In order to support this jetty is needed planning for a navigation channel, port basin, breakwaters, as well as dimensions and structure of the jetty along with the attributes. Navigation channel of Tanjung Bonang Rembang Port is planned facing towards Northeast with depth that is used at least -10.5 m, navigation channel width is taken by 137 m and port basin depth is -10 m. The type of breakwaters structure is rubblemound breakwaters for the west side and east side. The structure of jetty is used local cast reinforced concrete with strength of concrete f'c = 35 MPa. Foundation structure are using steel piles with quality JIS A5525, SKK 400, fy’ = 2,350 kg/cm2. In the planning of this jetty, system structure is analyzed by using the program SAP 2000 with 3D models. Load and reinforce structures is controlled by SNI regulations and BMS 1992. From the designing plan result is obtained that jetty consists of a jetty head and 2 trestle. The dimension of jetty head is 170 m length and 22 m width, while the dimension of trestle is 26 m length and 10 m width. The jetty beam dimension is 40 cm width and 60 cm height, while the pile dimension is 45 cm diameter, 1.2 cm thickness, and 20.65 m length for vertical pile and 20.75 m length for diagonal piles with slope ratio 10 V: 1 H. Pile cap dimension for single pile on jetty head and trestle is 1 x 1 x 1.5 m. Pile cap dimensions for double pile on jetty head is 1.5 x 1 x 1.5 m, and pile cap dimensions for the edge of jetty head is 1.6 x 1.2 x 2.6 m. On the berthing structure is used Fentek Arch Fender-type AN 600 L = 2,500 mm and the mooring structure is used Bollard and Bitt with a capacity 50 tons.