Dwi Kurniani
Jurusan Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH. Tembalang, Semarang 50275

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

PERENCANAAN EMBUNG TAMANREJO KECAMATAN SUKOREJO, KABUPATEN KENDAL Bachtiar Khoironi Wibowo; Arvie Narayana; Abdul Kadir; Dwi Kurniani
Jurnal Karya Teknik Sipil Volume 3, Nomor 3, Tahun 2014
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (757.397 KB)

Abstract

The population and community activities that lead to increased irrigation water demand is increasing and causing problems between water balance demand and water availability. To overcome this case was built water building of small dam. Tamanrejo small dam situated on the Kajar River, Sukorejo Kendal Regency. Tamanrejo small dam is planned to meet the needs of irrigation water in the District Sukorejo, irrigation area that will be served an estimated area of 750 acres. Discharge mainstay Kajar River calculated based FJ. Mock method with the probability of 20% is not being met. In Agustus until November there is a shortage of water at 108.493,75 m3. Small dam volume of 126.073,69 m3 is at an elevation of +140,00 m to +147,00 m. The result of water balance calculations indicate that the volume of 126.073,69 m3 can to meet the need of irrigation water when the river have flow shortage. Calculation results obtained irrigation water needs 1,54 l/sec/acres as irrigation water requirement rate on average. Construction of a small dam Tamanrejo be making use of the spillway and dam embankment body. Determination of dimensions small dam Tamanrejo use flood discharge plan from the HSS Gama I method of 83,189 m3/sec with a return period of 50 years. The planned small dam 11 m high, with a base elevation ponds +140,00 m, +151,00 m small dam crest elevation. Small dam crest width of 5,00 m, upstream slope of 1:3 and downstream slope of 1:2,25. In planning small dam Tamanrejo used ogee type open spillway (overflow spillway) with a width of 25 m, length 13 m and elevation crest spillway at +147,00 m, using an eject USBR type III with a length of 5,00 m. Plan Implementation time is 24 weeks with work plan budget of Rp. 6,258,700,000.00 (Six Billion Two Hundred Fiffty Eight Million Seven Hundred Thousand Rupiah). Conclusion with built small dam can overcome the shortage of irrigation water.
PENINGKATAN FUNGSI BENDUNG PLUMBON-SEMARANG SEBAGAI PENGENDALI BANJIR Danang Dwi Admojo; M. Kurnia Hermawan; Salamun Salamun; Dwi Kurniani
Jurnal Karya Teknik Sipil Volume 4, Nomor 4, Tahun 2015
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Flood happened recently is already a thing happened each time in various regions in Indonesia, not least in Semarang, especially in the area Mangkang. Improved function of the weir Plumbon previously only built for irrigation becomes a flood control dam is expected to reduce or cope with floods that occur each year in these areas. Plumbon river has a total length of 14.123 km with the average slope of the river (i) 0.0165. Plumbon watershed has an area of 20.36 km2. Planning weir Plumbon increased functionality using rainfall data of the last 12 years (2002 - 2014) with 3 stations namely rain Middle Reef (33F), Mangkang Reservoir (41C), Kaligading (20). Calculation of flood discharge plan obtained with a return period of 20 years (Q20) of 365.015 m³ / s with HSS method Gama I. Enhanced functions for flood control is done by raising the dam height lighthouse, so the catchment area will increase and may decrease the discharge passing through the dam , Plumbon weir using high lighthouse beacon round with 8 m wide and 17 m effective. Plumbon weir is planned to advance along the floor of 9.0 m and use a pool megrim with length of 16.5 m with a thickness of 2.5 m pool floor megrim selected while the pool is the type USBR type III.