Sistem Pendeteksi Kualitas Air Di Sekitar Pesisir Pantai Tondo Menggunakan Metode Fuzzy Logic Andi Rusdin; Jumiyatun Jumiyatun; Moh Idham Sesenggi; Harsano Jayadi
PROtek : Jurnal Ilmiah Teknik Elektro Vol 9, No 1 (2022): PROtek : Jurnal Ilmiah Teknik Elektro
Publisher : Program Studi Teknik Elektro Universitas Khairun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33387/protk.v9i1.3602

Abstract

The disaster that hit Palu City recently caused changes in the quality of water consumed by the community. To find out whether it is feasible or not, we need a method to detect a water quality system that is easy to implement at an economical price to be used for daily needs. Therefore, a tool is designed to determine the quality of water that is sampled around the Tondo beach using the Fuzzy Logic method. This design was built using the Arduino module by combining four sensors, namely a pH sensor, a TDS sensor, a Turbidity sensor, and a temperature sensor. Water quality in this study was divided into three groups, namely drinking water (UM), washing water (UC), and unsuitable water (TL). The water quality benchmark value is known from combining the results of existing sensor readings, wherein sample 1, the value of water quality measured in the study is in the category not in accordance with the fuzzy value 10, in sample 2,the use of washing uses the fuzzy value of 45.68 and sample three is worth 26.4
Study of Contract Change Order (CCO) on Implementation Time in Building Construction Project Tutang Muhtar Kamaludin; Andi Rusdin; Nirmalawati Nirmalawati
Journal of Applied Engineering and Technological Science (JAETS) Vol. 4 No. 2 (2023): Journal of Applied Engineering and Technological Science (JAETS)
Publisher : Yayasan Riset dan Pengembangan Intelektual (YRPI)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37385/jaets.v4i2.1664

Abstract

The aim of this research is to identify the main causes and effects of CCO in the construction of the Palu State Islamic University (IAIN) campus II building project for the Faculty of Tarbiyah and Teacher Training and the Faculty of Sharia and Islamic Economics Lecture Building. Tasks included conducting a field survey via a questionnaire and interviews with main parties; project owner, contractors and consultants who are directly related to the project. It was determined that the top three causes of CCO from project owner, contractor and consultant. The contractor has do CCO at the beginning of the project of 70% respondent, while consultant has changed contract order at mid-project implementation of 50% respondents and 70% at the end project implementation from the contractor. The results that are quite important from this study are the discovery of volume estimation errors and changes in work methods. Errors in estimating volumes are caused by the planning consultant's inaccuracy in planning so that there is a significant difference in volume from the initial contract with conditions in the field so that some work items experience an increase or decrease in volume