Fitri Awaliah
Program Studi Teknik Sipil Fakultas Pendidikan Teknologi dan Kejuruan UPI

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

ANALISIS PERBANDINGAN WAKTU DAN BIAYA KONSTRUKSI BETON MENGGUNAKAN METODE CETAK DITEMPAT DAN PRACETAK Fitri Awaliah; Siti Nurasiyah; Istiqomah Istiqomah
Kokoh Vol 19, No 2 (2021): Juli 2021
Publisher : Universitas Pendidikan Indonesia (UPI)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The selection of a construction method can result in differences in cost and time in its implementation. The wiser we are in choosing a construction method, then we will get the best results, especially in terms of cost and time. In the implementation of concrete work there are several methods including the on-site molding method and precast.Keywords: Cast- In Situ Concrete, Cost Analysis, Implementation, Precast Concrete, , Time Analysis