Mochamad Nasrullah
Badan Tenaga Nuklir Nasional

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

PERHITUNGAN BIAYA KERUSAKAN DAN KARBON DALAM BIAYA EKSTERNALITAS PEMBANGKIT LISTRIK ; COST CALCULATION OF DAMAGE, AND CARBON IN EXTERNALITIES COST POWER PLANT Nasrullah, Mochamad; Kuncoro, Arie Heru
Ketenagalistrikan dan Energi Terbarukan Vol 15, No 1 (2016): KETENAGALISTRIKAN DAN ENERGI TERBARUKAN
Publisher : P3TKEBTKE

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Untuk memenuhi kebutuhan tenaga listrik, pemerintah berupaya meningkatkan penggunakan energi baru terbarukan dalam pembangkitan listrik. Penelitian ini bertujuan melakukan kajian biaya ekster-nalitas pembangkit listrik berbahan bakar fosil, dan berdasarkan hasil kajian tersebut dapat diketahui kebijakan harga listrik dari pembangkit listrik energi terbarukan secara tepat. Metode yang digunakan adalah Impact Pathways Assessment yaitu memperkirakan dampak kerusakan lingkungan (dampak kesehatan bagi manusia), akibat pencemaran udara pada operasional pembangkit listrik yang dikon-versikan dalam bentuk uang (monetary valuation) berupa biaya eksternalitas. Perhitungan biaya ek-sternalitas merupakan gabungan dari biaya kerusakan yang diakibatkan oleh emisi PM10, SO2 dan NOx dengan biaya karbon (carbon tax) akibat emisi CO2. Dengan asumsi carbon tax sebesar 10 $US/MTCO2 berakibat biaya eksternal carbon tax rata-rata menjadi sebesar 2 mills$/kWh. Hasil perhi-tungan menunjukkan biaya eksternalitas yang terkecil adalah PLTP Kamojang sebesar 0,0054 cents$/kWh dan terbesar adalah PLTU Sicanang Belawan sebesar 2,600 cents$/kWh. Penyebab besarnya biaya eksternalitas carbon tax adalah heating value dari bahan bakar dan biaya karbon. Sedangkan besarnya biaya eksternalitas dari kerusakan emisi polutan akibat besarnya tingkat emisi polutan. Per-bandingan biaya eksternalitas menunjukkan pembangkit EBT bisa lebih kompetitif dari pada pem-bangkit fosil. Perencanaan pengembangan pembangkit listrik, jika hanya mempertimbangkan aspek ekonomi, maka energy fosil di masa mendatang tetap mendominasi. Dengan memasukkan faktor ek-sternalitas diharapkan perencanaan pengembangan pembangkit listrik menjadi paradigma pem-bangunan berkelanjutan. To meet the need for electricity, the government seeks to increase the use of renewable energy in elec-tricity generation. This research aims to assess external costs of fossil-fueled power plants, and based on these results it can be seen that electricity pricing policy of renewable energy power plants appro-priately. The method used is Impact Assessment Pathways estimating the environmental impacts (impacts to human health), air pollution in power plant operations are converted into money (monetary valuation) in the form of external costs. Calculation of external costs is a combination of the cost of damage caused by emissions of PM10, SO2 and NOx at a cost of carbon (carbon tax) as a result of CO2 emissions. Assuming a carbon tax of $ 10 US / MTCO2 result in the external costs of car-bon tax amounting to an average of $ 2 mills / kWh. The calculations show that the smallest of exter-nalities is the smallest of geothermal power plants Kamojang $ 0.0054 cents / kWh and is the largest Sicanang Belawan power plant for $ 2.600 cents / kWh. The cause of the high cost of externalities of a carbon tax is the heating value of the fuel and carbon costs. While the magnitude of the externality costs of damage caused caused by the level of pollutant emissions of pollutant emissions. Comparison of external costs of renewable energy plants could indicate more competitive than fossil plants. Plan-ning the development of power generation, if only consider the economic aspects, fossil energy in the future continue to dominate. By using the externalities factors expected power development planning
COMPARATIVE ECONOMIC ASSESSMENT BETWEEN SMR PLANTS AND LARGE PLANT IN COMPARISON WITH CPP TAKING INTO ACCOUNT ENVIRONMENTAL ASPECT Nasrullah, Mochamad
Ketenagalistrikan dan Energi Terbarukan Vol 12, No 2 (2013): KETENAGALISTRIKAN DAN ENERGI TERBARUKAN
Publisher : P3TKEBTKE

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Construction of N uclear Power Plant (NPP) in a country is always a controversy. The size of capacity on Nuclear Power Plant becomes important whether to use large capacity or small capacity, as this will give an effect in the Levelized Unit Electricity Cost. The study will assess the LUEC and the Levelized Unit Product Cost of electricity and non-electricity, also present a comparative economic assessment between SMR and large PWR, and comparison with different energy resources taking into account the environmental aspect. The models used to calculate the economics of power plants are G4Econs, IAEA’s models in spreadsheet form released in 2008. The models will take into account the investment cost, fuel cost, operational and maintenance (O&M) cost. Using 10% discount rate, the result of economic assessment shows that generation cost of large unit does not always cheaper the smaller units. Pembangunan PLTN disetiap negara selalu terjadi suatu kontroversi. Ukuran kapasitas PLTN menjadi penting apakah menggunakan kapasitas besar atau kecil, hal ini akan berpengaruh dalam biaya pembangkitan listrik. Studi ini akan memperkirakan biaya pembangkitan listrik dan biaya sampingan dari pembangkit listrik dan non listrik. Selain itu juga menyajikan suatu perbandingan perkiraan ekonomi antara PLTN ukuran SMR dan PLTN ukuran besar yang akan dibandingkan dengan sumber energi yang berbeda (PLTU) yang mempertimbangkan aspek lingkungan. Model yang digunakan untuk menghitung keekonomian PLTN tersebut adalah G4Econs. Model ini dibuat IAEA dalam bentuk spreadsheet yang dipublikasikan tahun 2008. Model ini akan menghitung biaya investasi, biaya bahan bakar, biaya operasi dan perawatan. Dengan menggunakan discount rate 10% hasil perhitungan ekonomi menunjukkan biaya pembangkitan ukuran besar tidak selalu murah jika dibandingkan dengan ukuran kecil.