Ali Cahyadi Achmad
Executive of Water Resources Management, Public Works Office of North Maluku Province, Ternate, Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Evaluation on the Implementation of Early Warning System for Debris Flow in Merapi Area (Case Study at Boyong River) Ali Cahyadi Achmad
Journal of the Civil Engineering Forum Vol. 1 No. 3 (September 2015)
Publisher : Department of Civil and Environmental Engineering, Faculty of Engineering, UGM

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (600.956 KB) | DOI: 10.22146/jcef.24003

Abstract

One of disasters caused by volcanic activity of Mount Merapi is secondary disaster. The disaster usually occurs after eruption and this volcanic activity produces volcanic and pyroclastic material deposit around the top of the mountain as a result of previous eruption. This material might collapse downward in the form of debris flow as it is affected by natural event such as high intensity rainfall. Therefore, a research is needed to analyze whether existing forecasting and early warning system are capable to provide information for the people living in hazardous area before the debris flood occur. This research was carried out using field survey, observation and interview method. Data analysis used qualitative descriptive method by making description of actual condition of the researched location general condition and qualitative analysis of telemetry system installed on Mount Merapi. The qualitative analysis of telemetry system covers network, hardware, software, power supply, security system, operation and maintenance, also human resources. Research analysis used primary and secondary data. Research results revealed that mean rainfall intensity above of 60 mm/hour might trigger debris flood. Early warning should be given at the rainfall intensity level of 50-55 mm/hour, and debris flood time travel from the upstream to the observed location in Pulowatu Village is 45 minute. Based on the analysis of the present forecasting and early warning system, it is known that some of the equipment is not well functioned, so that debris flow cannot be predicted and detected. This is caused by the lack of human resource quality of the officers in operating and maintaining the equipment. Concerning that matter, it is necessary to conduct some improvement to achieve better forecasting and early warning system in order to give information regarding occurrence of debris flow.