Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi

Analisis Kelayakan Panjang dan Tebal Perkerasan Runway Untuk Pesawat Jenis B737-900ER yang Beroperasi di Bandar Udara Banyuwangi I Putu Ariawan; Iqbal Wahyudi; Made Widya Jayantari
Jurnal Ilmiah Telsinas Vol 4 No 2 (2021)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (406.929 KB) | DOI: 10.38043/telsinas.v4i2.3341

Abstract

Runway is an airport facility which is very important for aircraft landing and taking off. The runway is a square area on the surface of the airport that is prepared for aircraft take off and landing, without a well-planned and managed runway, the aircraft will not be able to use the airport. In designing the runway, it is strictly regulated regarding the length, width, orientation (direction), configuration, slope / slope, and thickness of the runway pavement. This final project will analyze the feasibility of the runway length and the thickness of the pavement (runway) for the operational plan aircraft that will be used in the next 20 years. With ARFL corrections to the existing runway conditions, the current runway length is 2,500 meters. For the next 20 years traffic flow is forecasted using linear regression analysis from 2011 to 2037. From the forecasting results, it was found that the total aircraft movement was 19,138 movements (R1), so it was planned to use the B 737 900 ER aircraft because this aircraft had a passenger capacity of 220 seats. This aircraft is the reference for the planning of the runway dimensions. Some of the resulting planning analyzes include: the length of the planned runway is 2,498 meters long and 45 meters wide. Meanwhile, the pavement planning analysis resulted in a surface layer thickness of 4 inches, a base coarse layer of 13 inches, and a subbase thickness of 22 inches.
Penilaian Kinerja dan Penyusunan AKNOP Embung di Provinsi Bali Irma Suryanti; Putu Indah Dianti Putri; Made Widya Jayantari
Jurnal Ilmiah Telsinas Vol 5 No 1 (2022)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (445.386 KB) | DOI: 10.38043/telsinas.v5i1.3694

Abstract

Performance assessment and preparation of AKNOP (operation and maintenance costs) were carried out on 13 reservoirs in the province of Bali, including Embung Badeg, Embung Batudawa, Embung Baturinggit, Embung Besakih, Embung Bukit, Embung Datah I, Embung Datah II, Embung Dukuh, Embung Muntig, Embung Seraya Timur, Embung Seraya, Embung Telung Buana, and Embung Untalan located in Karangasem Regency. The purpose of this study is to evaluate the reservoir performance against the specified assessment aspects and to obtain the planned operating and maintenance costs for the reservoir facilities and infrastructure based on the damage criteria. The evaluation of the operation performance and maintenance of the reservoir refers to the Circular Letter of the General Director of Water Resources, Ministry of Public Works and Housing. Meanwhile, the AKNOP value is calculated from the total of multiplication volume, frequency, and unit price of work for each reservoir operation and maintenance activity. The reservoir performance evaluation is based on four criteria, physical performance, operating and service performance, security and environmental system performance, and institutional performance. From the study, the result shows that 13 reservoirs' performances are in adequate condition. The operation and maintenance can be done by routine and periodic maintenance activities based on operating and maintenance cost plans. This activity is expected to reduce reservoir damage.
Penilaian Kinerja dan Penyusunan AKNOP Embung di Provinsi Bali Irma Suryanti; Putu Indah Dianti Putri; Made Widya Jayantari
Jurnal Ilmiah Telsinas Vol 5 No 1 (2022)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (445.386 KB) | DOI: 10.38043/telsinas.v5i1.3694

Abstract

Performance assessment and preparation of AKNOP (operation and maintenance costs) were carried out on 13 reservoirs in the province of Bali, including Embung Badeg, Embung Batudawa, Embung Baturinggit, Embung Besakih, Embung Bukit, Embung Datah I, Embung Datah II, Embung Dukuh, Embung Muntig, Embung Seraya Timur, Embung Seraya, Embung Telung Buana, and Embung Untalan located in Karangasem Regency. The purpose of this study is to evaluate the reservoir performance against the specified assessment aspects and to obtain the planned operating and maintenance costs for the reservoir facilities and infrastructure based on the damage criteria. The evaluation of the operation performance and maintenance of the reservoir refers to the Circular Letter of the General Director of Water Resources, Ministry of Public Works and Housing. Meanwhile, the AKNOP value is calculated from the total of multiplication volume, frequency, and unit price of work for each reservoir operation and maintenance activity. The reservoir performance evaluation is based on four criteria, physical performance, operating and service performance, security and environmental system performance, and institutional performance. From the study, the result shows that 13 reservoirs' performances are in adequate condition. The operation and maintenance can be done by routine and periodic maintenance activities based on operating and maintenance cost plans. This activity is expected to reduce reservoir damage.