Syahir Mahmud
Universitas Atma Jaya Makassar

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

PELATIHAN DAN PEMBANGUNAN HYBRIDISASI PLT MIKROHYDRO–PLT SOLAR POWER DI GEREJA KATOLIK ST.ANNA LEKKE KEC. SIMBUANG KABUPATEN TANA TORAJA Aries Kamolan; Syahir Mahmud; Limbran Sampebatu
Batara Wisnu : Indonesian Journal of Community Services Vol. 2 No. 1 (2022): Batara Wisnu | Januari - April 2022
Publisher : Gapenas Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1108.091 KB) | DOI: 10.53363/bw.v2i1.66

Abstract

Currently, people at Lekke Village use electricity supplied by Micro hydro Power Plant. The plant of this turbine is located at about 5-6 km from the village and operates only about 10-12 hours per day, from 06.00 PM in evening to 06.00 AM in the morning. The remote location of the micro hydro plant decreases the received voltage at the community. Besides, the unstable condition of turbine installed at Lekke Village resulted in the fluctuation of the output frequency and voltage.  At dry season, the decrement of water flow makes the decrement of the supplied power from the micro hydro plant. While in rainy season, the turbine sometimes fail to operate properly because of garbage, dry leaves, etc. which fall into the river and blocked its flow. Due to this condition, the needs of electricity at Lekke Village are crucial and needs the installation of solar power to meet the community needs. This activity trains local people to have a basic ability on how to build hybrid power installation of turbine and solar power. For this purpose Pengabdian Kepada Masyarakat (PKM) Team from Enginering Faculty of Atmajaya Makassar University is funded by Dirjen Pendidikan Tinggi, Riset dan Teknologi Kementerian Pendidikan dan Kebudayaan through Kegiatan Bantuan Pendanaan Program Penelitian Kebijakan Merdeka Belajar Kampus Merdeka dan Pengabdian Masyarakat Berbasis Hasil Penelitian dan Purwarupa PTS Ditjen Diktiristek.  This training provides 2 basic skills to local people: 1). How to install Solar Power to be used at Sound System and lighting in the St.Anna church; 2) How to build the control system for the hybridization of micro hydro power-solar power.  This training conducts in 2 consecutive session which is training session and installation session. Training session provide basic knowledge of micro hydro power-solar power to the local people and at the installation session the local people together with the trainer work together to install the solar power at St. Anna Church. This activity installs 2X140 WP solar panel with capacity equal to 140 Watt. The solar panel supported by 2x60 Watt batteries. After the installation, the installed system at St.Anna Church able to work 24 hours, supply 70 Watt Sound System and activate 10 lighting points where each point needs 7 Watt. The hybrid installation equipped with a controller that gives ability to select the input power from micro hydro power or from solar power
Penyuluhan Pencegahan Bahaya Listrik dan Petir pada Instalasi Listrik Rumah Tangga di Lembang Dewata Kecamatan Mappak Kabupaten Tana Toraja Syahir Mahmud
Batara Wisnu : Indonesian Journal of Community Services Vol. 2 No. 2 (2022): Batara Wisnu | Mei - Agustus 2022
Publisher : Gapenas Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53363/bw.v2i2.100

Abstract

Tana Toraja Regency as one of the national tourist destinations within the administrative area of South Sulawesi Province. Tana Toraja Regency, which has a city in Makale, is located at 3°06'17"S South Latitude and 119°51'07" East Longitude. Tana Toraja Regency has an area of 2,054.30 km² and has a population of 270,489 people. Tana Toraja Regency consists of 19 sub-districts, one of which was chosen to be the location of community service for the Electrical Engineering Study Program, namely: Mappak Lembang Dewata District. The distance between the capital of Tana Toraja Regency and the provincial capital of South Sulawesi reaches 314 km. Electrical installations should be designed and installed on the basis of as required in the PUIL. In addition, the requirements for technical personnel who will install an electrical installation must be certified for competence in accordance with Law No.30 of 2009 concerning electricity. However, there are still often news of accidents caused by electric shocks, both those who died and those who were only limited to electric shocks. Such is the case with the danger of lightning that constantly lurks in other living things. This lightning has the potential to cause lifelong disability until death. For this reason, we from the Abmas Team of the Electrical Engineering Study Program, Faculty of Engineering, UAJ Makassar, are here to bridge between ordinary people about the potential dangers of electricity and lightning strikes and preventive efforts that can be done so that they can be avoided from the possibility of avoiding these accidents. The abmas team from the UAJM Electrical Engineering Study Program will help the community to explain how to overcome this which has become an obligation to carry out the duties of the Tri Darma of Higher Education, one of which is Community Service. The real form of community service that will be carried out is to provide counseling to the lembang dewata community about; How should efforts be made to avoid and prevent the occurrence of electrical accidents and lightning strikes that will be conveyed to the general public. This counseling explains the sources of electric shock hazards in a household installation and how to prevent them, along with the potential dangers of lightning strikes and how to avoid them. The material is delivered in the form of visualization of imaginative and communicative models and drawings