Claim Missing Document
Check
Articles

Found 3 Documents
Search

PEMODELAN ANOMALI GRAVITASI DENGAN PENDEKATAN BENDA BERBENTUK SILINDER Rahmanto, Dedi; Yulianto, Tony
JURNAL SAINS DAN MATEMATIKA Volume 17 Issue 3 Year 2009
Publisher : JURNAL SAINS DAN MATEMATIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (632.481 KB)

Abstract

ABSTRACT---A  gravity  anomalies  modeling  program    has  been  made  with  the  approximation  of  cylinder shaped body  for  the case of  N anomalous bodies. This program  is named DRAVECT version 1.1. The modeling program was executed by Microsoft Visual Basic   6.0   programming language.The program was made by identifying gravity problems. Input and output data that be identified from gravity parameters, dimension and position parameters of anomalous bodies. The gravity   anomalies were calculated by  inserting synthetic data  to the  modeling  program.  The  anomaly  profiles  3  D  were  displayed  automatically,  and  the  profiles  of  gravity anomalies 2 D were made respectively. Validation test had been done by compare program result with reference. Based  on  the  graphical  qualitative  interpretation  of  gravity    anomaly  profiles  as  the  result  of  the  conducted modeling, it was obtained the characteristics of gravity anomaly of cylinder shaped body. Keyword : gravity anomalies, cylinder
UPAYA MENINGKATKAN KUALITAS PENYERAPAN ANGGARAN SULAWESI SELATAN TAHUN 2023 Rahmanto, Dedi
Referensi : Jurnal Ilmu Manajemen dan Akuntansi Vol 12, No 1 (2024)
Publisher : Unitri Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33366/ref.v12i1.5512

Abstract

Purpose: This study aims to analyze the quality of budget implementation by work units partnering with KPPN Makassar I in the first semester of 2023, focusing on factors affecting the low level of budget absorption. The method used was a survey utilizing questionnaires, which were distributed to 80 respondents from work units in Makassar City, Maros, and Pangkep. The questionnaire was designed to collect data on aspects of Budget Revision, Disbursement, Work Execution, Administration, Human Resources (HR), and Compliance. Data analysis was performed by evaluating responses to these aspects. The survey results indicate that the quality of budget implementation is at a moderate level, with problems ranging from 40% to 60%. The two main issues identified are Budget Revision and Work Execution. In the context of Budget Revision, the Automatic Adjustment process and frequent revisions of the POK (Work Output Planning) are the primary challenges. Meanwhile, in Work Execution, the biggest challenges are the hindered procurement process and difficulties in carrying out operational spending proportionally. The study's conclusion emphasizes the importance of improving coordination among relevant parties and enhancing planning quality to address these challenges and encouraging efficiency and effectiveness in future budget implementation.
ADDRESSING BUDGET ABSORPTION CHALLENGES: CASE STUDY OF KPPN PATI IN SUPPORTING NATIONAL DEVELOPMENT Saputro, Aris; Aristiati, Mujahidah; Roviani, Heni; Rahmanto, Dedi; Soeratin, Harry Z.; Bin Karnoto, Suparjito
Oikos Nomos: Jurnal Kajian Ekonomi dan Bisnis Vol 18, No 1 (2025): Juni 2025
Publisher : Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37479/jkeb.v18i1.32050

Abstract

This study aims to describe efforts to improve the quality of budget absorption in the work area of the State Treasury Service Office (KPPN) Pati using data from 2023-2024. The method used in this research is a qualitative method by describing the various efforts made to optimize budget absorption and supported by data on the realization of budget absorption. Based on the Budget Implementation Review Report (RPA), the realization of expenditures of Ministries/Institutions (K/L) in the working area KPPN Pati reached Rp833 billion or 98.44 percent of the 2024 budget ceiling allocation and Rp729 billion or 98.49 percent of the 2023 budget ceiling allocation. The challenges in budget absorption include the compatibility between budget plans and implementation, the procurement process of goods and services, and the coordination between stakeholders in budget implementation. Solutions to address these challenges include improvements in aspects of budget planning, optimizing the use of digital systems in budget execution and improving coordination with all stakeholders.