This Author published in this journals
All Journal SENTIA 2015
Gatot Joelianto
Seminar Nasional Teknologi Informasi Politeknik Negeri Malang

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

UPAYA PENGEMBANGAN GREEN PORT MELALUI PENGGANTIAN CAPTIVE POWER PADA GANTRY JIB CRANE Rahman Azis Prasojo; Epiwardi Epiwardi; Gatot Joelianto
SENTIA 2015 Vol 7, No 1 (2015)
Publisher : SENTIA 2015

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (567.777 KB)

Abstract

Port of Panjang is located in Bandar Lampung, Lampung Province. As a strategic port in Indonesia, it requires the development of facilities and equipment to increase its functional role and meets the high standard of service. Four units of Gantry Jib Crane (GJC) in the Dock D is using on-board engine (diesel genset) as a captive power as power supply. Diesel genset operation cost much and poluuting the air around the port.In effort to reach the category of Green Port, PT. Pelindo II intends to save energy and reduce air pollution in the port of panjang, replacing captive power of GJC, which has been using a captive power supply, will be replaced with electricity from the PLN grid. Diesel-gensets that already exist are used as stand-by unit to be operated when the power source of the electricity out or disrupted.The captive power replacement designed and then operating cost analysis and environmental analysis are calculated. With maintaining the genset on each crane, the crane reliability level in the services, loading and unloading can take place continuously.