Claim Missing Document
Check
Articles

Found 2 Documents
Search

Waste Reduction Potential in SAMTAMA Program Implementation (Study Case: RT 10/RW 03 Cempaka Putih Timur) Yemima Marnalita Hasibuan; Filson Maratur Sidjabat
Journal of Environmental Engineering and Waste Management Vol 6, No 1 (2021)
Publisher : President University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33021/jenv.v5i2.1276

Abstract

Waste is one of the big problems often faced by metropolitan cities like DKI Jakarta. The Jakarta Environment Agency's research stated that DKI Jakarta produces 7500-tons of waste per day with 60.5% coming from residential. Therefore, the DKI Jakarta government initiated the Sampah Tanggung Jawab Bersama (SAMTAMA) to mobilize residential people to manage waste from its source at certain locations as a pilot, one of locations is RT 10 / RW 03 Cempaka Putih Timur. RT 10 / RW 03 Cempaka Putih Timur is the RT that is considered optimal in implement the SAMTAMA program. Based on this, the objectives of this study are: (1) to find the existing condition of SAMTAMA program; (2) to measure the waste generation, composition, and reduction potential in the implementation of SAMTAMA program. The method implemented in measuring using SNI 19-3964-1994 which is carried out for 8 consecutive days. Waste composition is classified based on SNI 19-3964-1995, supplemented with components of B3 waste and diapers. The results of the analysis show that the average of waste generation is 14.99 kg/day where the treated waste is 11.36 kg/day and the untreated or residual waste is 3.63 kg/day with the largest composition is food waste with 10.66 kg/day (71%). With SAMTAMA Program implementation, the waste potential reduction can reach 0.019 kg/day/person.
ISO 14001:2015 and ISO 9001:2015 Implementation in Con-struction Company: Study Case: PT. Adhi Karya (Persero) Tbk, PT. Nusa Kon-struksi Enjiniring Tbk, Eiffage, and Acciona, S,A Rizka Dwi Apriliani; Yemima Marnalita Hasibuan; Filson Maratur Sidjabat
Jurnal Lingkungan dan Sumberdaya Alam (JURNALIS) Vol. 2 No. 2 (2019): Environmental
Publisher : Program Studi Teknik Lingkungan, Fakultas Teknik, Universitas Banten Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (607.15 KB)

Abstract

In this era of globalization, competition between producers is commonplace as well as companies in the construction sector that have developed a lot. This causes the quality of the products and services to be increasingly considered. Thus, construction company needs to get standardized recognition up to international standards stating that the products and systems used are worth buying. The international standard that is often used by various companies is ISO 14001: 2015, which states a commitment to save the environment, and ISO 9001: 2015 which states a commitment to increase customer satisfaction. The aim of this study is to know the implementation and achievement of these standards in construction companies. This study discusses implementation in 4 domestic and foreign companies as representative namely, PT. Adhi Karya (persero) Tbk, PT. Nusa Konstruksi Enjinirin, Tbk, Eiffage, and Acciona, S, A. The method used in this study is a qualitative research method based on the annual report of each company. The results of this study known that each company has its own strategy to achieve ISO 14001: 2015, in PT. Nusa Konstruksi Enjiniring Tbk (NKE) they do direct action in protecting the environment such as managing the waste produced, preventing pollution, also following the existing regulation. In PT. Adhi Karya, they more consider about the health and safety of the work place, prioritizing the use of eco-friendly and energy saving products, pollution prevention and natural resources. Acciona, S,A and Eiffage they more consider about the environmental protection norms it is common to build designated infrastructure to preserve the environment and treat the waste.