STUDI KELAYAKAN PEMBANGUNAN INSTALASI JARINGAN PIPA AIR DENGAN METODE COST & BENEFIT ANALYSIS GUNA MEMINIMALKAN WAKTU MATERIAL HANDLING Esa Rengganis
Angkasa: Jurnal Ilmiah Bidang Teknologi Vol 8, No 1 (2016): Mei
Publisher : Institut Teknologi Dirgantara Adisutjipto

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (192.217 KB) | DOI: 10.28989/angkasa.v8i1.134

Abstract

Production facility have a significant influence on production process. CV. Jokudo Kamsa got a problem on water filling on rotary drum, it takes 120 minutes on tanning process. It causes the facility is not enough for this process. So, we need to build pipe installation to reduce material handling time, especially on water filling’s time. Feasibility study on pipe installation based on Benefit Cost Analysis Methode. We applied NPV, Payback Period and Return On Investment. Based on data tabulation we found Rp. 84,787,387,75 on NPV, 74,87 percent on ROI and 5.23 months on PP. And the most important thing we can reduce material handling time in 70 minutes on water filling with material handling cost as big as Rp. 139,804,9.