Claim Missing Document
Check
Articles

Found 5 Documents
Search

Designing Project Stakeholder Management Plan at Coffee Plant Construction Project for Sucessful Initiating Phase in Ciwidey Devi Pratami; Nurfitri Ayu Puspitasari; Imam Haryono
International Journal of Innovation in Enterprise System Vol 1 No 01 (2017): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25124/ijies.v1i01.6

Abstract

CV Trianom Agrotektur is a company engaged in coffee industry. Due to high demand and expanded business process the company owner is going to build a new plant in Ciwidey. The current plant cannot cover the whole business process of in processing coffee beans. The extensification towards the plant requires some guidance to lead the successful contruction project. However, building plants in rural area is not a simple thing. There should be some investigation towards stakeholders’ needs/interests or requirements. The project should also face an issue pertaining to management, i.e. how to manage stakeholders who still keep their local tradition. This study is aimed at designing project stakeholder management plan based on PMBOK 5 edition. The study shows that there are 21 stakeholders classified in 4 quadrants. Those stakeholders will be managed based on their power and interest level. Keywords— Stakeholder, Communication, Project, Coffee Plant
Designing Risk Qualitative Assessment on Fiber Optic Instalation Project in Indonesia Devi Pratami; Fachri Fadlillah; Imam Haryono; Ageak Raporte Bermano
International Journal of Innovation in Enterprise System Vol 2 No 02 (2018): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25124/ijies.v2i02.25

Abstract

A project always has risks that can lead to project failure. In the project, a risk analysis is required to provide an evaluation for the project to proceed as planned. In the event of inadequate planning and ineffective control, it will result in irregularities identified as a risk to the project. This study aims to analyze the qualitative risk on Fiber Optic Installaion project in Sukabumi, West Java, Indonesia. In addition, risk assessment is undertaken on project implementation. Assessment of risk using the impact and probability to measure the impact of risk occurrence. The impacts are more detailed by classified by time impact, cost impact, quality impact, safety and security impact, proximity. The result is there are 36 risk that may occur and mostly risks are associaated by quality and safety&security impact. Keywords— risk assessment, qualitative analysis, Project, fiber optic.
QUALITY METRIC DESIGN USING INTERNAL CONTROL METHOD TO CONTROL THE QUALITY OF FIBER OPTIC INSTALLATION PROJECT Rizka Hasna Delvika; Imam Haryono; Devi Pratami; Ageak Raporte Bermano
International Journal of Innovation in Enterprise System Vol 3 No 01 (2019): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (500.384 KB) | DOI: 10.25124/ijies.v3i01.27

Abstract

To provide internet network, one of public Telecommunication provider in Indonesia conduct several project related to fiber optic cable installation such as the STO Modernization Feeder project. In every project implementation, the company is concerned with quality in order to remain competitive with competitors. Deliverable which meets the project quality will produce the product in accordance with the requirements. STO Garut Feeder Modernization Project was experiencing delays which is caused by the non-conformity project deliverable to project specification during monitoring & controlling phase. At project planning, the quality metric was not designed, which can be used as a guideline for vendor in carrying out the project task and to assist the process of quality control. Quality metric design is carried out using internal control methods that can identify possible errors in each project activity and critical success criteria that define a successful activity that will be performed. Result shows that only 67.1% statement (critical success criteria) form critical activity is implemented. This result can answer why the project delay because the activity on critical path is mostly re-worked due to non-conformity issues. Keywords—Quality, quality metric, internal control, control quality, telecommunication project
Analisis Beban Kerja Karyawan Departemen Perakitan PT XYZ Dengan Menggunakan Metode Full Time Equivalent Noval Cahyo Triyanto; Sonny Taufan; Dadi Mahardi; Kasduni; Mustofa; Imam Haryono; Iskandar, Donant Alananto
KALBISCIENTIA Jurnal Sains dan Teknologi Vol. 11 No. 01 (2024): Sains dan Teknologi
Publisher : Research and Community Service INSTITUT TEKNOLOGI DAN BISNIS KALBIS

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53008/kalbiscientia.v11i01.3605

Abstract

PT XYZ has not evaluated the workload received by employees in the fan grille part in the assembly department and the management of PT XYZ does not yet know the effectiveness of the work of employees in the fan grille part in the assembly department after carrying out labor efficiency. From the results of workload calculations using the FTE method after labor efficiency, there is 1 operator who has ineffective work effectiveness because the operator's FTE value is overloaded (> 1.28), including operator 1 with an FTE value of 1.36 while 5 other operators have effective work effectiveness because the FTE value of the five operators is <1.28, including operator 2 has an FTE value of 1.17, operator 3 has an FTE value of 1.11, operator 4 has an FTE value of 1.23, operator 5 has an FTE value of 1.18 and operator 6 has an FTE value of 1.22.
Analisis Beban Kerja Karyawan Departemen Perakitan PT XYZ Dengan Menggunakan Metode Full Time Equivalent Noval Cahyo Triyanto; Sonny Taufan; Dadi Mahardi; Kasduni; Mustofa; Imam Haryono; Iskandar, Donant Alananto
KALBISCIENTIA Jurnal Sains dan Teknologi Vol. 11 No. 01 (2024): Sains dan Teknologi
Publisher : Research and Community Service UNIVERSITAS KALBIS

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53008/kalbiscientia.v11i01.3605

Abstract

PT XYZ has not evaluated the workload received by employees in the fan grille part in the assembly department and the management of PT XYZ does not yet know the effectiveness of the work of employees in the fan grille part in the assembly department after carrying out labor efficiency. From the results of workload calculations using the FTE method after labor efficiency, there is 1 operator who has ineffective work effectiveness because the operator's FTE value is overloaded (> 1.28), including operator 1 with an FTE value of 1.36 while 5 other operators have effective work effectiveness because the FTE value of the five operators is <1.28, including operator 2 has an FTE value of 1.17, operator 3 has an FTE value of 1.11, operator 4 has an FTE value of 1.23, operator 5 has an FTE value of 1.18 and operator 6 has an FTE value of 1.22.