Rizki Prayudi Ramadhan
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PADA PEMBANGUNAN PROYEK “SCE” MENGGUNAKAN METODE ANALYTICAL HIERARCHY PROCESS Rizki Prayudi Ramadhan
Jurnal Bisnis dan Keuangan Vol 5 No 1 (2020): Business and Finance Journal
Publisher : UNUSA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33086/bfj.v5i1.1489

Abstract

This study aims to identify and find solutions to delay construction work happening on the SCE project. The SCE project is a school building construction project. The background of this study is due to indications of delay with a difference of 25% between the schedule plan and the reality in the ground. The factors that cause the delay must be well identified so that a larger delay can be avoided and can provide solutions to these problems. From the results of Fishbone analysis and AHP, 11 factors were found to influence the delay in SCE project.