Hikmah Sidiq Kurniawan
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Beban Kerja Karyawan PT XYZ Indonesia pada Bagian Insulation Menggunakan Metode Full Time Equivalent Hikmah Sidiq Kurniawan
STRING (Satuan Tulisan Riset dan Inovasi Teknologi) Vol 5, No 2 (2020)
Publisher : Universitas Indraprasta PGRI Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (61.656 KB) | DOI: 10.30998/string.v5i2.7783

Abstract

PT XYZ Indonesia is a company engaged in manufacturing by producing power transformers located in west java. In the implementation of the production process of PT XYZ Indonesia, there are sometimes problems. The problem that occurs in PT XYZ Indonesia is the production process time in the insulation section exceeds the specified target time, because the operator’s work activities are less productive, it is necessary to calculate workload in order to know the workload obtained by the operator. The purpose of this study is to level the operator workload and determine the number of workers to be optimal. Researchers used the full time equivalent method to revise the problem, by measuring the operator’s work time so that it knows the value of the workload obtained. After calculating using this method, the actual conditions at PT XYZ Indonesia have 16 operators in the insulation section, with an average value of the workload obtained is 0.34 while the recommendation of the researchers is 9 work operators in the insulation section with an average value the workload obtained is 1.06, so that it is easy to supervise the operator due to a reduction or diversion of 7 operators.