Abdul Munir
Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala, Banda Aceh

Published : 5 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 5 Documents
Search

EVALUASI SARANA EVAKUASI KEBAKARAN DI KAWASAN PASAR MODERN (STUDY KASUS: SUZUYA MALL) Rahmat Rizki Z; Mochammad Afifuddin; Abdul Munir
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 2, No 3 (2019): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v2i3.13456

Abstract

Infrastructure development in Banda Aceh is experiencing a rapid increase, the occurrence of urbanization has its own impact on development. Construction of commercial buildings on a large scale makes the city of Banda Aceh even more beautiful. With the emergence of buildings that vary in demanding safety and security aspects of the building and the environment. Besides having a traditional market, Banda Aceh also has several modern markets namely Suzuya Mall, Hermes Mall and Matahari Store, and Pasar Atjeh New Building. In maintaining the comfort and tranquility of the community during the visit, it takes the safety of supporters inside the building. Various safety aspects exist, one of the most important aspects of safety that must be fulfilled by the building is the evacuation route. The methodology used mix methods between qualitative and quantitative while the number of samples used were 91 visitors and 64 employees. The result of primary data analysis from 10 (ten) variables explains that there are some variables whose interpretation of the score is small or categorized neutral with the meaning of the need for improvement such as the availability of exit (emergency exit) with the value of frequency index (FI) of 0.52; emergency door conditions with an FI value of 0.60; emergency lamp with FI value of 0,51; fire detector with an FI value of 0.50; disaster evacuation system with FI value of 0,51 and disaster management management with FI value equal to 0,50. The strategy that can be done based on the SWOT analysis is by establish Expert Staff who have been provided with education and training on disaster management; Compile Standard Operating Procedure (SOP) for disaster risk management; and Carry out regular short simulations / exercises.
Kajian Kepuasan Pengguna Rumah Bantuan Cinta Kasih Panteriek Banda Aceh Rika Indriati; Mochammad Afifuddin; Abdul Munir
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 1, No 3 (2018): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v1i3.11770

Abstract

Post-disaster earthquake and tsunami December 26, 2004 Aceh region suffered a devastation in the field of infrastructure is quite wide, especially housing that amounted to ± 123,000 units. The construction of relief housing for disaster victims by relocating one of them is located in the village of Panteriek Lueng Bata district of Banda Aceh under the name of Cinta Kasih Housing built by Tzu Chi volunteers (Yayasan Budha Tzu Chi Indonesia) of 716 houses. This study aims to determine the level of satisfaction of the people who use Rumah Cinta Kasih Panteriek assistance and analyze the dominant factors of satisfaction level from the location, building design, product quality, facilities and infrastructure. Determination of this research sample using slovin formula obtained 83 house units as a sample of 486 housing units that have not changed shape. Methods used mix methods between qualitative and quantitative where in the primary data collection using cluster sampling technique, then the data is analyzed by index frequency. This research begins with a pre-survey process where tested the questionnaire to determine the level of validity and reliability on each item question tested to 10 respondents. Pre-survey results show that the validity value of 0,31 – 0,70greater than 0.3 while the reliability value 0,86 greater than 0,6 with the sense that the questionnaire is feasible used in this study. The results showed that as many as 16% of respondents answered very satisfied and 28% answered satisfied; 21% answered quite satisfied; 15% answered not satisfied; and 20% of respondents answered very dissatisfied with the Cinta Kasih Panteriek. The dominant factor causing dissatisfaction of the householder is clean water (PDAM or drilled well) with value FI = 0,28; (FI = 0,36), land area (FI = 0,38), and house size (FI = 0,38). While the most dominant factor of the satisfaction of home users is access to the highway with the value of FI = 0,80. From the results of this study it can be concluded that the main cause of dissatisfaction of people in Cinta Kasih Panteriek caused by inadequate network of water supply as basic human needs in carrying out its activities.
TINGKAT KEPUASAN PENERIMA BANTUAN RUMAH DHUAFA DI PROVINSI ACEH (STUDY KASUS: KABUPATEN ACEH UTARA) Fani Saputra; Mochammad Afifuddin; Abdul Munir
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 1, No 4 (2018): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v1i4.12461

Abstract

Aceh province, especially in North Aceh Regency, there are still many poor people who do not have a house as a means of decent residence to be occupied. Therefore, In 2016 the Government of North Aceh allocates about 120 units of houses dedicated to the Help Home. The house which is sourced from APBA fund is a development activity of simple healthy house of III area which has been completed and some have been given to the people who are entitled to receive. This study aims to determine the condition of existing houses and the level of home receipts satisfaction that is destined for the Help Home in North Aceh district in 2016. The methodology used mix methods between qualitative and quantitative while the number of samples used as many as 55 respondents from the population of 120 units. The existing condition of the house that became the object of research is a house type 36 with 2 bedroom units with an area of 3,80 x 2,50 m; family room 4,85 x 2,50 m; bathroom 1,40 x 1,75 m; and a front porch with a size of 2,50 x 1,50 m. The level of satisfaction is analyzed based on frequency index analysis. The result shows that the cause of dissatisfaction of the society to the relief house are: house size with the value of frequency index (FI) 0,32; the amount and space of the house with the value of FI 0,33; clean water network (PDAM or drilling well) with value of FI 0,34; access to health facilities (puskesmas / RS) with an FI value of 0,34; the state of the door / window (when opened and closed again) with a value of FI 0,35; access reach security post (security / polsek / polres) with value FI 0,36; access to public transport with an FI value of 0,37; and quality and condition of bathroom and septitank with value 0,38. From the results of the study it can be concluded that the beneficiary community of Help Home is less satisfied with the assistance.
KAJIAN KEANDALAN UTILITAS BANGUNAN GEDUNG RUSUNAWA DI KOTA BANDA ACEH Raja Idin; Abdul Munir; Mochammad Afifuddin
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 1, No 3 (2018): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v1i3.11778

Abstract

Pembangunan Rumah Susun Sewa (RUSUNAWA) kian meningkat seiring dengan bertambahnya jumlah penduduk di kawasan perkotaan. Pemerintah menyediakan Rusunawa sebagai hunian layak bagi masyarakat berpenghasilan rendah (MBR), terutama yang selama ini tinggal di kawasan yang dianggap kumuh. Hampir seluruh Rusunawa  di Kota Banda Aceh yang mengalami permasalahan pada utilitas baik plumbing maupun pencahayaan/penerangan yang mengakibatkan kurangnya kenyamanan bagi penghuni Rusunawa. Permasalahan dalam penelitian ini adalah bagaimana keandalan utilitas Rusunawa di Kota Banda Aceh. Tujuan penelitian ini untuk mengetahui tingkat keandalan masing-masing gedung sekaligus mengetahui apakah ada perbedaan baik secara umum maupun khusus terhadap utilitas, instalasi plumbing dan instalasi penerangan /pencahayaan dalam penggunaan bangunan Rusunawa dan mengkaji kelayakan utilitas pada bangunan Rusunawa yang ada di Kota Banda Aceh. Metodologi penelitian ini awalnya dimulai dengan pengumpulan data primer dan sekunder, observasi ditulis secara deskriptif mengenai aktivitas yang  terjadi, juga direkam dengan kamera foto mengenai gambaran kondisi kerusakan Rusunawa di Kota Banda Aceh. Pengambilan sampel dilakukan dengan metode random sampling yaitu pengambilan sampel dari anggota populasi dengan cara acak tanpa memperhatikan strata (tingkatan) dalam anggota populasi tersebut, artinya siapa saja yang secara tidak sengaja bertemu dengan peneliti dan sesuai dengan karakteristiknya maka orang tersebut dapat digunakan sebagai sampel (responden). Jumlah rusunawa 2 tower berada di UIN Ar raniry Banda Aceh dan Asrama Polisi Lamtemen Banda Aceh. Responden yang digunakan dalam penelitian ini berjumlah 76 responden serta menggunakan rumus slovin dengan tingkat kesalahan 5%. Metode analisis data yang digunakan adalah metode deskriptif dengan menggunakan nilai variabel keandalan utilitas dan skala likert. Hasil penelitian ini yaitu diketahuinya kerusakan yang diklasifikasi berdasarkan tingkat keandalan utilitas, meningkatkan pengetahuan tentang tingkat keandalan bangunan serta meminimalisir setiap kesalahan-kesalahan pada tahap perencanaan dan pembangunan Rusunawa yang ada di Kota Banda Aceh.
FAKTOR-FAKTOR PENGHAMBAT PEMBANGUNAN RUMAH LAYAK HUNI UNTUK KAUM DHUAFA DI PROVINSI ACEH (STUDY KASUS: KABUPATEN ACEH UTARA) Mustafaruddin Mustafaruddin; Mochammad Afifuddin; Abdul Munir
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 1, No 4 (2018): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v1i4.12462

Abstract

The habitable home construction activity is the North Aceh Regency Government program dedicated to the Dhuafa people. The implementation of the project is submitted to the contractor as responsible for completing the construction of a habitable home. Each planned project must have an implementation plan, when the start and end of the project, on-site technical and resource provision is essential to avoid the risk of obstacles in the implementation of the project. Problems that arise in the field are very risky and should be avoided so that the project being done can run smoothly. The purpose of this research is to identify the factors of inhibition in the implementation of habitable home project for the Dhuafa as well as to analyze a good strategy in minimizing the inhibition. The research method used is mix methode between qualitative and quantitative method. The number of executors of Dhuafa house construction in 2016 is 64 companies. The number of respondents obtained from the slovin formula of 39 companies. The results of the research explain that the factors causing the occurrence of obstacles during the execution of work is the labor factor with the value of frequency index (FI) of 0,84; design and planning factors with an FI value of 0,81; factor of equipment with value of FI 0,77; factors beyond the contractor's ability with a FI value of 0,75; material factor with value of FI 0,55; field condition factor with FI value of 0,46; and implementation factor and working relationship with FI value of 0,40. The ways that can be done to avoid the occurrence of barriers in terms of labor is to improve the quality of labor, increase the workforce who are competent in their fields, and work in accordance with the procedure. In terms of design and planning is to do a design review of the project.