Xiedong Zhang
Road and Railway Engineering, School of Transportation, Wuhan University of Technology, 430063 Wuhan,

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

A Mathematical Model for Ballast Tamping Decision Making in Railway Tracks Mohammad Daddow; Xiedong Zhang; Hongsheng Qiu; Zhihua Zhang; Yingqi Liu
Civil Engineering Journal Vol 6, No 10 (2020): October
Publisher : Salehan Institute of Higher Education

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.28991/cej-2020-03091601

Abstract

Ballast tamping is considered as an important maintenance process for railway infrastructures and has a large influence on the capacity of any railway networks. But optimizing the plan of that process is a complex problem with a high cost. This paper discusses optimizing tamping operations on ballasted tracks to improve the track geometry and reduce the total maintenance cost. A mathematical model for this problem in the literature is improved here by including the restriction on the resources (tools, workers and budget) in the model and including constant/variable values for track possession cost and available resources. The optimal solutions obtained for all instances are found by using the global optimization. Besides, a numerical study is presented to test and evaluate the model performance. The results show that the proposed model can be adopted by the infrastructure manager (IM) to make suitable tamping scheduling decisions under normal or private conditions; however, the private conditions lead to an increase of the final cost compared to that of the normal ones. Doi: 10.28991/cej-2020-03091601 Full Text: PDF
Prediction of Ground Settlement Induced by Slurry Shield Tunnelling in Granular Soils Mo'men Ayasrah; Hongsheng Qiu; Xiedong Zhang; Mohammad Daddow
Civil Engineering Journal Vol 6, No 12 (2020): December
Publisher : Salehan Institute of Higher Education

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.28991/cej-2020-03091617

Abstract

Underground structures play an important role in achieving the requirements of rapid urban development such as tunnels, parking garages, facilities, etc. To achieve what is needed, new transportation methods have been proposed to solve traffic congestion problems by using of high-speed railway and subway tunnels. One of the issues in urban spaces due to tunnel excavation is considerable surface settlements that also induce problems for surface structures. There are a variety of published relationships concerned with field measurements and theoretical approaches to evaluating the amount of the maximum surface settlement value due to tunneling. This paper studies the ground surface settlement caused by the Greater Cairo Metro – Line 3 - Phase-1. This project was constructed by a slurry shield Tunnel Boring Machine (TBM). Therefore, this work consists of two parts. The first part presents the details of the project and monitoring results field and laboratory geotechnical investigations in order to determine the soil properties. The second part is to the comparison between the field measurements and theoretical approaches for surface settlement due to tunneling construction. At the end of the works, the results show that the more convenient methods which approach the field measurements, and the major transverse settlement occurs within the area about 2.6 times the diameter of the tunnel excavation. Doi: 10.28991/cej-2020-03091617 Full Text: PDF