Pertimbangan Biaya dalam Pemilihan Bekisting Mohammad Arif Bahtiar Efendi; Rendi Gusta Wibowo
JURNAL PILAR TEKNOLOGI Jurnal Ilmiah Ilmu Ilmu Teknik Vol. 6 No. 2 (2021): JURNAL PILAR TEKNOLOGI
Publisher : LPPM Universitas Merdeka Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33319/piltek.v6i2.101

Abstract

Materials in the construction world is progressing quite rapidly. Likewise formwork as a project is also experiencing quite rapid progress which refers to the value of the results of a project. In a project the determination of the type of system and formwork method will affect the cost and time in progress, the selection of the formwork method which is not appropriate will have a loss in the future. The analysis conducted is comparing formwork of semi-conventional methods and system (PERI) in column, beam and plate formworks of the INKA Graha Building Construction Project, Madiun. The objective to be achieved in this paper is to find out the type of formwork that is efficient to be used in a formwork work both for beam and plate columns, in terms of cost comparisons and finding a draw point between the two methods. After analyzing it is known that the use of semi-conventional initiating systems is more efficient with a value of Rp. 2,349,756,391, - and for the PERI system costs Rp. 3,050,649,782, - .. The draw point of this system is in the volume of 31,500 m2 which means that in this volume the use of semi-conventional systems and PERI systems does not differ in terms of cost.
Manajemen Pengendalian Waktu Dan Biaya Pada Proyek Daerah Irigasi Saluran Primer Ketonggo Dengan Menggunakan Metode Pert Mohammad Arif Bahtiar Efendi
JURNAL PILAR TEKNOLOGI Jurnal Ilmiah Ilmu Ilmu Teknik Vol. 9 No. 1 (2024): JURNAL PILAR TEKNOLOGI
Publisher : LPPM Universitas Merdeka Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33319/piltek.v9i1.170

Abstract

This thesis presents the results of research about time and cost control management in Ketonggo Primary Canal Irrigation Area project. Time and cost in the best planning is needed in project implementation to ensure that project implementation can achieve maximum results by utilizing existing resources. This study uses the PERT (Program Evaluation and Review Technique) method. By implementing Network planning which is one of the management techniques to plan and control the implementation of a project. Optimization needs to shorten the duration of the project with minimal expenditure. Total of this contract is Rp. 4,706,045,953.00 with 90 days of completion. The results of this analysis showed that the most likely project completion time was 90 days, with the fastest being 75 days and the slowest being 105 days. Based on the critical path analysis, obtained 9 work items that are very influential in the smooth running of the project. The optimal project cost at normal time is Rp. 4,249,989,942.19 and the total cost required for project acceleration is Rp. 4,710,928,986. Additional costs are used for additional manpower, additional working hours and additional hours of heavy equipment.