Pengembangan Metode Fast-Track untuk Mereduksi Waktu dan Biaya Pelaksanaan Proyek Studi Kasus Rumah Menengah di Malang, Jawa Timur Tjaturono, Tjaturono; Mochtar, Indrasurya B.
MEDIA KOMUNIKASI TEKNIK SIPIL Tahun 17, Nomor 1, PEBRUARI 2009
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (301.682 KB) | DOI: 10.14710/mkts.v17i1.3775

Abstract

Construction cost of the middle-class housing in Indonesia tends to increase especially if a delay occurs at critical-path activities. Up to the moment the solution of this problem is by doing trade-off between the time and the cost. With this procedure, usually the completion time can be accelerated, but the increase in construction cost is unavoidable. It is described in this paper a method to accelerate the completion time of activities in the critical patch, so that the completion time can be kept as planned, but the construction cost does not increase. One of the efforts carried out here is by developing the fast-track method on critical activities with a modification of CPM model scheduling, and it is for case of construction of middle-class housing in Malang, East Java. The methods applied were site observation in the construction time and cost of the critical activities, and interview with the site manager as well as the supervisor. The data was processed non-statistically. The results obtained prove that the developed fast-track method here gives an advantage in time saving of 34% from the completion time in general and cost saving of 2.45%. Keywords: Time saving, cost reduction, CPM model, fast-track, middle-class housing. ABSTRAK Biaya pembangunan rumah menengah di Indonesia cenderung membengkak, terutama jika terjadi keterlambatan waktu penyelesaian aktifitas-aktifitas pada lintasan kritis. Hingga kini cara yang digunakan untuk mengatasi masalah ini adalah dengan melakukan trade-off antara waktu dan biaya. Dengan cara itu, umumnya percepatan waktu penyelesaian dapat dilakukan, tetapi pembengkakan biaya pembangunan tidak terelakkan. Diuraikan dalam tulisan ini cara percepatan waktu pelaksanaan pada aktifitas di lintasan kritis agar waktu penyelesaian dapat dicapai sesuai rencana, tetapi biaya pembangunan tidak membengkak. Salah satu upaya yang dilakukan di sini adalah melakukan pengembangan metode fast-track pada aktifitas di lintasan kritis dengan modifikasi penjadwalan model CPM, dan untuk kasusnya adalah pada pembangunan rumah menengah di Malang, Jawa Timur. Metode yang digunakan adalah observasi lapangan terhadap waktu dan biaya pelaksanaan aktifitas pada lintasan kritis, dan wawancara dengan Site Manager serta Pengawas Lapangan. Data diolah secara non-statistik. Hasil yang diperoleh membuktikan bahwa pengembangan metode fast-track seperti ini memberikan keuntungan berupa penghematan waktu sebesar 34% dari waktu yang umumnya dibutuhkan dan penghematan biaya sebesar 2,45%. Kata kunci: Penghematan waktu, penghematan biaya, model CPM, fast-track, rumah  menengah
Effect of Construction Labour Group Composition on Optimal Field Labour’s Productivity in Malang- East Java Tjaturono, Tjaturono
MEDIA KOMUNIKASI TEKNIK SIPIL Tahun 18, Nomor 1, PEBRUARI 2010
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (6059.907 KB) | DOI: 10.14710/mkts.v18i1.7843

Abstract

One of the main factor which determines the labour productivity is the labour group composition. In Indonesia, the cost estimate of construction labour uses the labour groups of the productivities in Indonesian National Standard 2002 (SNI 2002) and itsmodofocation. However, using these productivities is not efficient and effective. This paper intens to detemnine the ideal labour group composition, the equivalent coefficient and the difference between the actual productivities and the productivities of SNI 2002. The research methodology used consist of field observation and interview with 240 labour groups of various compositions in the construction of middle-class houses in Malang, East Java. The data were processed by descriptive statistics and statistical test for mean differences. The result of this research shows that the ideal composition for floor tile laying, sawn form work, and concrete pouring are: 1 tiler: 2 labours, and 1 mason:4 labours respectively, the equivalent coefficients for various labour group compositions are obtained. The differences between the field productivities and the productivities of SNI 2002 for tile laying, sawn form work and concrete pouring are 286%, 114.8%, and 18% respectively. Keywords : Labour group composition, SNI 2002, field labour’s productivity, middle-class housing.   Abstrak   Salah satu faktor utama yang menentukan produktivitas tenaga kerja adalah komposisi kelompok kerja. Di Indonesia, estimasi biaya tenaga kerja konstruksi menggunakan komposisi kelompok kerja produktivitas Standar Nasional Indonesia (SNI) 2002 dan modifikasinya. Namun penggunaan produktivitas ini tidak efisien dan efektif. Tulisan ini bertujuan untuk menentukan komposisi kelompok kerja yang ideal, koefisien penyetaraan serta perbedaan produktivitas actual terhadap produktivitas SNI 2002. Metode penelitian yang dipakai adalah observasi lapangan dan wawancara terhadap 240 komposisi kelompok kerja pada pembangunan rumah menengah di Malang Jawa Timur. Data diolah secara statistic deskriptif dan statistical test for a mean differences. Dari hasil penelitian ini diperoleh komposisi kelompok kerja yang ideal untuk pasang tegel lantai, belisting dan pengecoran beton adalah: 1 tukang tegel: 2 pekerja, 1 tukang kayu:1 ½ pekerja dan 1 tukang batu: 4 pekerja. Diperoleh juga koefisien penyetaraan untuk berbagai komposisi kelompok kerja. Serta perbedaan produktivitas lapangan terhadap SNI 2002 untuk pekerjaan pasang tegel, belisting dan pengecoran beton sebesar 286%, 114,8% dan 18%. Kata-kata Kunci : Komposisi kelompok kerja, SNI 2002, Produktivitas tenaga kerja lapangan, Rumah menengah.