Claim Missing Document
Check
Articles

Found 1 Documents
Search

Penerapan Risk Management Framework untuk Pelaksanaan Proyek Alih Daya Sistem Informasi di BPK RI Andika Arif Sukrawan; Wing Wahyu Winarno
Jurnal Nasional Teknik Elektro dan Teknologi Informasi Vol 2 No 3: Agustus 2013
Publisher : Departemen Teknik Elektro dan Teknologi Informasi, Fakultas Teknik, Universitas Gadjah Mada

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1062.487 KB)

Abstract

Badan Pemeriksa Keuangan Republik Indonesia (BPK) as one of the government agencies or the public sector since 2002 until the present project has been realized in the form of outsourcing of information systems application software. Some examples of the failure of IT projects including IT outsourcing has demonstrated the importance of the role of risk management. One framework that can be used by organizations in implementing risk management approach is to use the Project Management Body of Knowledge (PMBOK). Stages of risk management contained in the PMBOK and IT outsourcing is discussed in depth in this study. The results of the application of risk management suggests that the absence of risk management plans and risk factor analysis of user needs, the risk of a protracted workmanship, and the risk of vendor staff qualifications are a high risk probability and impact. Development of risk response and risk monitoring and control is an important step after high risks identified. The results of the application is expected to be a guideline for the implementation of BPK in IT outsourcing, so that the benefits of IT outsourcing to precisely target.