Claim Missing Document
Check
Articles

Found 1 Documents
Search

Prakiraan Waktu Pelaksanaan Shutdown Maintenance di Kilang CDU V Balikpapan-Pertamina RU V Ain Sahara; Adhi Susanto; Indah Susanti
Jurnal Nasional Teknik Elektro dan Teknologi Informasi Vol 1 No 2: Mei 2012
Publisher : Departemen Teknik Elektro dan Teknologi Informasi, Fakultas Teknik, Universitas Gadjah Mada

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (640.663 KB)

Abstract

Refinery Crude Destilation Unit (CDU) V is part of the refinery. Distillation is a crude oil refinery processing crude oil into products which are often used in everyday life, such as gasoline, solar, kerosene, gas, and so. CDU is a distillation refinery process of crude oil by separating crude oil based on boiling points owned by each crude oil. The processing involves a wide range of controls and control instruments must have a reliable performance working process. The support of the implementation should be performed are often referred to the implementation of the shutdown maintenance within a specified period. In this study is the prediction time shutdown maintenance by using Reliasoft Software Weibull++ Version 7 with Weibull distribution function and linear regretion analysis. This using of this soft result of the most accurate rescheduling time to the implementation of the shutdown maintenance in revinery CDU V. The final result, shows that the shutdown maintenance should be done in once in 10 month. The result is expected to increase the optimal working performance of the tools of the company and finaly resulting the expected production outcome.