Claim Missing Document
Check
Articles

Found 2 Documents
Search

PERENCANAAN DAN PENGENDALIAN MATERIAL PADA PROYEK KONSTRUKSI PALU GRAND MALL Utama, Anugerah; Asnudin, Andi; Labombang, Mastura
JOURNAL TEKNIK SIPIL DAN INFRASTRUKTUR Vol 3, No 2 (2013)
Publisher : Jurusan Teknik Sipil Universitas Tadulako

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1047.261 KB)

Abstract

Palu Grand Mall construction project is a large-scale construction projects that use different types of materials with large amounts. Therefore, the planning and control of the appropriate material to be very important. The purpose of this study was to determine how the   process of planning and control of material and to determine the size of the procurement quantity of material from the two methods of inventory control consists of methods Lot For Lot and Economic Ordering Quantity method that provides the most optimal total costs in construction projects Palu Grand Mall. The method used in this thesis is descriptive photograph and methods Material Requirement Planning (MRP) consist of methods Lot For Lot (L4L) and the Economic Ordering Quantity (EOQ). The results revealed that, in the process of planning and controlling materials on construction projects Palu Grand Mall is the starting material requirements planning, material selection and proceed with the selection of suppliers of materials. Once that is done the booking and purchase of materials. Then the material receipt and storage of materials. The last process in the release of material to the construction site. Planning material procurement inventory control method provides a theoretical optimum total cost of inventory is a combined method of EOQ method and method L4L. The measure of the quantity of material procurement is a 5066 D19 iron rod, iron rods Ø10 number 58 591, iron rods D22 number 6638, beam 5/7 number 415 m3, and multiplex sheet 2903 with a total cost of inventories of Rp3.488.366, -.   Keywords: material, process planning and control, MRP
PENGARUH INFORMASI ASIMETRI, UKURAN PERUSAHAAN, DAN LEVERAGE, TERHADAP MANAJEMEN LABA (EARNINGS MANAGEMENT) PADA PERUSAHAAN MANUFAKTUR DI BURSA EFEK INDONESIA (BEI) Utama, Anugerah
MANABIS: Jurnal Manajemen dan Bisnis Vol. 1 No. 2 (2022): Juni 2022
Publisher : Yayasan Pendidikan Penelitian Pengabdian Algero

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (600.373 KB) | DOI: 10.54259/manabis.v1i2.931

Abstract

This research was conducted in manufacturing companies listed on the Indonesia Stock Exchange. The population in this study are all manufacturing companies listed on the Indonesia Stock Exchange (IDX) with observations for 5 consecutive years, namely 2015-2019. This period was chosen because the financial statements for that period are considered to be the latest reports. Based on the above results, the simultaneous test between X1, X2, and X3 the sig value in this test is 0.000 so it can be concluded that together the variables X1, X2, and X3 have a simultaneous effect on the y variable. This result is also corroborated by the comparison between f table and f arithmetic where the value of f count is 14,897 and f table N=141 is 2,44. So it can be concluded that H01 is rejected and Ha1 is accepted because the fcount value is 14.897 > ftable 2.44. The results of individual hypothesis testing for Information Asymmetry, Firm Size, and Leverage variables show that these variables have a significant effect on the Earnings Management variable (Y) simultaneously (simultaneously). This is illustrated by the acceptance of Ha and the rejection of H0 and the significance value of X5 0.000 less than 0.05. So it can be concluded that all independent variables have a significant effect on the timeliness of submitting financial statements.