Analysis Of Construction Management On The Ashley Hotel Central Jakarta Development Project Shilvy Aghniya; Saihul Anwar
Journal of Green Science and Technology Vol 3, No 2 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i2.2387

Abstract

Construction Management is the process of implementing management functions (Planning, Organizing, Actuating and Controlling) systematically on a project by using existing resources effectively and efficiently in order to achieve project objectives optimally.Analysis of Construction Management on the Ashley Hotel Central Jakarta Development Project isstartingfromtheanalysisofimplementationmethod,thecalculationoftheworkvolume,thecalculation of the needs of labor, material, and equipment, the calculation of the budget plan, and the time and cost control project with Barchart, S-Curve and Critical Path Method(CPM).Based on the analysis that has been done with Barchart, S-Curve and CPM, the construction of Ashley Hotel takes 69 weeks with an estimated cost of Rp. 39.091.299.600,00.Keyword : Construction Management, Barchart, S-Curve, CPM (Critical Path Method).
Analysis Of Construction Management On The Ashley Hotel Central Jakarta Development Project Shilvy Aghniya; Saihul Anwar
Journal of Green Science and Technology Vol 3 No 2 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i2.2387

Abstract

Construction Management is the process of implementing management functions (Planning, Organizing, Actuating and Controlling) systematically on a project by using existing resources effectively and efficiently in order to achieve project objectives optimally.Analysis of Construction Management on the Ashley Hotel Central Jakarta Development Project isstartingfromtheanalysisofimplementationmethod,thecalculationoftheworkvolume,thecalculation of the needs of labor, material, and equipment, the calculation of the budget plan, and the time and cost control project with Barchart, S-Curve and Critical Path Method(CPM).Based on the analysis that has been done with Barchart, S-Curve and CPM, the construction of Ashley Hotel takes 69 weeks with an estimated cost of Rp. 39.091.299.600,00.Keyword : Construction Management, Barchart, S-Curve, CPM (Critical Path Method).