Optimasi Jumlah Kedatangan KRL Commuter Line untuk Mengatasi Penumpukan Penumpang Jalur Bekasi - Jakarta Kota Menggunakan Simulasi Promodel Mirna Lusiani; Steven Chandra
JIEMS (Journal of Industrial Engineering and Management Systems) Vol 11, No 1 (2018): Journal of Industrial Engineering and Management Systems
Publisher : Universitas Bunda Mulia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30813/jiems.v11i1.1014

Abstract

A very large KRL/Commuter Line passenger increases at any time will cause problems to be monitored by P.T KAI with an enormous number of passengers who like to fly passenger accumulation. The total arrival of passengers built upon the system is 48182 passengers, with a time of 240 minutes (05.00-09.00). Based on the data analysis, it can be concluded that the model of Commuter Line Bekasi system to Jakarta Kota is currently stored in the passenger capacity whose KRL capacity itself is not enough with the number of passengers not transported is 7483 passengers. To overcome the current passenger accumulation is to use the scenario that has been made that is using the actual time of 14 minutes and increases the number of trains that should be 20 trains to 22 trains. The simulated scenario model result is 3034 passengers transported. Suggestions for further researchers to cope with a perfect passenger pile.
Usulan Perencanaan dan Pengendalian Persediaan Bahan Baku Menggunakan Metode Lot Sizing pada Pabrik Mebel Mirna Lusiani; Willy Sandi
JIEMS (Journal of Industrial Engineering and Management Systems) Vol 10, No 2 (2017): Journal of Industrial Engineering and Management Systems (JIEMS)
Publisher : Universitas Bunda Mulia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30813/jiems.v10i2.761

Abstract

This research discusses the planning and inventory control of raw materials in PT Rackindo Setara Perkasa which is one of the manufacturer in Indonesia which is engaged in the industry of knock-down furniture. The purpose of this study is to planning and controlling the inventory of raw materials with the lowest cost. The research is conducted to develop demand forecast in 2016, to develop the aggregate planning using LINGO software, then continued in the design of the Master Production Schedule (MPS) and Material Requirement Planning (MRP). This research discusses the comparison of several methods of Lot Sizing in MRP, such as the Economic Order Quantity (EOQ), Period Order Quantity (POQ) and Least Total Cost (LTC). The selected Lot Sizing method is a method with the lowest inventory cost.Keywords: Inventory Control, Forecasting, Aggregate Planning, Lot Sizing, Master Production Schedule, Material Requirement Planning
Usulan Kebijakan Persediaan Bahan Baku dengan Metode Lot Sizing pada Perusahaan Manufaktur Gelas Plastik Mirna Lusiani; Eko Verdianto
JIEMS (Journal of Industrial Engineering and Management Systems) Vol 11, No 2 (2018): Journal of Industrial Engineering and Management Systems
Publisher : Universitas Bunda Mulia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30813/jiems.v11i2.1181

Abstract

This research was made with the aim to make production planning and inventory control in manufacturing company of plastic glass, especially for main raw material from 14 oz plastic cup product, that is Resin-HE 2.0 and whitening using lot sizing method. Due to the fluctuating demand and the accumulation of raw materials in the warehouse, the company needs for production planning and inventory control. The lot-sizing method used in this research is Period Order Quantity (POQ), Lot For Lot (LFL) and Fixed Period Requirement (FPR) which each method have a different concept. The result by using FPR Method 3 weeks and LFL in inventory control will give the lowest inventory cost to the company that is equal to Rp. 159.400,00 for Resin-HE 2.0 and Rp. 39.600,00 for whitening.