This Author published in this journals
All Journal Jurnal Titra
Joan Yuwono
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Rancangan Perbaikan Beban Kerja Staf di Departemen Purchasing PT Insera Sena Yuwono, Joan; Palit, Herry Christian
Jurnal Titra Vol 2, No 1 (2014)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

Process of bicycle’s raw materials procurement in PT Insera Sena is handled by Purchasing Department. The problem in the Purchasing Department is employee’s workload at the level of Purchasing head and staff is not balanced. Workload among employees during observation is between 72.56% to 117.46% with average of workload is 97.05%. The evaluation shows that activity performed by Purchasing head and staff are not according to job description and work procedures. Some improvement plans are simulated and workload is between 82.85 % to 99.92 % with average of workload is 92.46 %. These improvement plans can save Rp 10.906.711,11 per year with assumption the minimum wage of Sidoarjo in 2013 is about Rp 1.720.000,00.
Rancangan Perbaikan Beban Kerja Staf di Departemen Purchasing PT Insera Sena Joan Yuwono; Herry Christian Palit
Jurnal Titra Vol 2, No 1 (2014)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (165.321 KB)

Abstract

Process of bicycle’s raw materials procurement in PT Insera Sena is handled by Purchasing Department. The problem in the Purchasing Department is employee’s workload at the level of Purchasing head and staff is not balanced. Workload among employees during observation is between 72.56% to 117.46% with average of workload is 97.05%. The evaluation shows that activity performed by Purchasing head and staff are not according to job description and work procedures. Some improvement plans are simulated and workload is between 82.85 % to 99.92 % with average of workload is 92.46 %. These improvement plans can save Rp 10.906.711,11 per year with assumption the minimum wage of Sidoarjo in 2013 is about Rp 1.720.000,00.