Basuki Anondho
Tarumanagara University

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisis Faktor Eksternal Yang Dominan Terhadap Biaya Overhead Proyek Konstruksi Hendi Wijaya; Basuki Anondho
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 4, November 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v4i4.12592

Abstract

ABSTRACTOverhead costs are one of the cost components that play an important role in the company's performance in maintaining good quality work. However, the overhead costs in a project are different and are influenced by several factors. One of the factors that influence it is the external factor of the project. The external factors of each project are different. This is because each project must adapt the workplace environment to certain functions, designs, and preferences. On that basis, to be able to better estimate the overhead in a project, further costs are needed for any external factors that affect construction overhead project costs, and a few percent of the direct costs of construction projects to anticipate the risks caused by overhead costs. . Data was collected through a structured questionnaire distributed to some people working in the construction sector from contractors in several regions in Indonesia. The analysis results obtained as many as 3 groups of external factors that affect construction project overhead costs, namely economic factors, legal factors, and sociocultural factors related to the COVID-19 pandemicABSTRAKBiaya overhead merupakan salah satu komponen biaya yang berperan dan berpengaruh penting terhadap kinerja perusahaan konstruksi dalam menjaga kualitas pekerjaan yang baik. Akan tetapi biaya overhead dalam suatu proyek berbeda-beda, dan dipengaruhi oleh beberapa faktor. Salah satu faktor yang mempengaruhinya ialah faktor eksternal proyek. Faktor eksternal dari setiap proyek berbeda-beda. Hal ini dikarenakan setiap proyek harus menyesuaikan lingkungan tempat kerja dengan fungsi, desain, serta prefensi tertentu. Atas dasar itu, untuk dapat lebih baik dalam mengestimasi biaya overhead dalam sebuah proyek maka diperlukan identifikasi lebih jauh terhadap faktor-faktor eksternal apa saja yang dominan berpengaruh terhadap biaya overhead proyek konstruksi, dan menyisihkan beberapa persen dari biaya langsung proyek konstruksi untuk mengantisipasi resiko yang disebabkan oleh biaya overhead.  Data dikumpulkan melalui kuesioner terstruktur  yang disebarkan kepada sejumlah orang yang bekerja di bidang konstruksi dari pihak kontraktor di beberapa wilayah di Indonesia. Dari hasil analisis diperoleh sebanyak 3 kelompok faktor eksternal yang dominan mempengaruhi biaya overhead proyek konstruksi, yaitu  faktor ekonomi, faktor legal, dan faktor sosial-budaya yang juga berkenaan dengan adanya pandemi COVID-19. 
PERINGKAT FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS KONSTRUKSI AKIBAT PENYEBARAN VIRUS COVID-19 Jessica Clarita; Basuki Anondho
JMTS: Jurnal Mitra Teknik Sipil Volume 5, Nomor 1, Februari 2022
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v5i1.16852

Abstract

A construction project is a series of activities as a way to complete an object requested by the owner by optimally utilizing the available resources. Increased productivity in a construction project is also one of the indicators that the project is achieving success, both for the provider and the service provider. However, the spread of the COVID-19 virus in Indonesia, especially the Jabodetabek area which also attacks the construction sector, has caused the productivity of project performance to decrease. Therefore, it is necessary to identify what factors affect construction productivity due to the spread of the COVID-19 virus. Data was collected through a literature study and followed by a survey using a Likert scale questionnaire to service providers in the project. A Likert scale of 1-5 and Relative Importance Index (RII) method are being used to arrange ranking of factors that affect construction productivity due to the spread of the COVID-19 virus. The results of the calculation of the relative importance index (RII) show that the availability of materials and equipment is ranked first with an RII value of 0,96 and the labor availability factor remains in the last rank with an RII value of 0,745.Proyek konstruksi merupakan serangkaian kegiatan yang dilaksanakan sebagai cara untuk menyelesaikan suatu objek yang diminta oleh pemilik dengan memanfaatkan secara optimal sumber daya yang tersedia. Peningkatan produktivitas dalam proyek konstruksi ikut menjadi salah satu indikator yang menandakan bahwa proyek tersebut mencapai kesuksesannya, baik bagi pihak penyedia maupun pemberi jasa. Namun, adanya persebaran virus COVID-19 di Indonesia khususnya wilayah Jabodetabek yang juga menyerang bidang konstruksi menyebabkan produktivitas kinerja proyek menjadi menurun. Oleh sebab itu, perlu adanya identifikasi mengenai faktor-faktor apa saja yang mempengaruhi produktivitas konstruksi akibat penyebaran virus COVID-19. Data dikumpulkan melalui studi literatur dan dilanjutkan dengan survei yang menggunakan kuesioner berbentuk skala likert kepada para penyedia jasa di proyek. Skala likert berskala 1-5 digunakan dalam mengukur tingkat pengaruh suatu faktor dan dengan metode Relative Importance Index (RII), peringkat dari faktor-faktor yang mempengaruhi produktivitas konstruksi akibat penyebaran virus COVID-19 dapat tersusun. Hasil perhitungan indeks kepentingan relatif (RII) menunjukkan bahwa faktor ketersediaan material dan peralatan menduduki peringkat pertama dengan nilai RII sebesar 0,96 dan faktor ketersediaan tenaga kerja tetap berada di peringkat terakhir dengan nilai RII sebesar 0,745.