ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN WAKTU PADA PEKERJAAN BASEMENT GEDUNG BERTINGKAT SEMI TOP-DOWN Joshua Wangsadiputra; Jane Sekarsari
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 4, November 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i4.8371

Abstract

Time delays in construction project will be very detrimental for both the provider and user of construction service because it can cause a conflict which leads to time demand and additional cost. The timeliness in construction of basement is one of the important aspect to gain a success at construction project, remembering basement is an early phase of development at high-rise building project. The purpose of this study is to analyze the factors that can cause time delay in high-rise building semi top-down basement work. The research method used in this study is quantitative and descriptive approach with questionnaire distribution to some high-rise building projects with semi top-down basement. With the help of SPSS software, next step is to analyzing the data in the form of a validity test, reliability test, normality test, and Relative Importance Index (RII) test. The result of this study shows 5 factors that cause the most influence the delay of semi top-down basement work based on the importance ranking is variation and changes of order by owner, low productivity level of labors, leak on the diaphragm wall, repeated changes rebar layout due to space that too narrow, and material delivery delays. ABSTRAKKeterlambatan waktu pada pelaksanaan proyek akan sangat merugikan para pelaku jasa konstruksi karena dapat menyebabkan konflik yang berujung terjadinya tuntutan waktu dan biaya tambahan. Ketepatan waktu pada pekerjaan basement merupakan salah satu aspek penting dalam kelancaran suatu proyek konstruksi, mengingat basement merupakan salah satu pembangunan tahap awal pada proyek gedung bertingkat. Penelitian ini bertujuan untuk menganalisa faktor-faktor yang dapat mempengaruhi keterlambatan waktu pada pekerjaan basement semi-top down. Metode penelitian yang digunakan pada studi ini adalah pendekatan secara deskriptif kuantitatif dengan penyebaran kuesioner kepada beberapa proyek gedung bertingkat dengan basement semi top-down. Selanjutnya, dilakukan pengolahan data dengan bantuan software SPSS berupa uji validitas, uji reliabilitas, uji normalitas, dan Relative Importance Index (RII). Hasil penelitian menunjukkan, terdapat 5 faktor yang paling mempengaruhi keterlambatan pekerjaan basement semi top-down menurut tingkat pengaruhnya yaitu perubahan perintah kerja dan variasi dari owner, produktivitas pekerja lapangan yang rendah, terjadi kebocoran pada Dinding Penahan Tanah (DPT), pengaturan tata letak penyimpanan tulangan yang berulang-ulang akibat lahan yang terlalu sempit, dan pengiriman material yang terlambat.
ANALISIS ASPEK SUMBER DAYA MANUSIA TERHADAP KINERJA PEKERJA PROYEK KONSTRUKSI Yohanes Willy; Jane Sekarsari
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 3, Agustus 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i3.8392

Abstract

Human resources is one important things to achieve a successful construction project, because the success of a service provider includes human resources. However, in its implementation, construction service providers pay less attention to it. The aspect of human resources is aspects of work competence, work motivation, work loyalty and work discipline. A purpose of this research is to find how the influence of aspects of human resources on the performance of construction project workers in order to create good employee performance so that construction activities can run optimally and efficiently. The study was conducted by distributing questionnaires using purposive sampling techniques with 30 respondents. The data analysis technique used is SPSS software version 25. Data analysis was carried out from the validity test, reliability test, classic assumption test (normality test), descriptive analysis, and Relative Importance Index (RII). The results of the analysis indicate that aspects of human resources affect the performance of construction project workers and the most influential is aspect of work discipline, then the second is aspect of loyalty, the third is aspect of competence and last is  motivational aspect. Thus construction service providers can pay attention to aspects of human resources in order to improve labor performances.ABSTRAKSumber  daya  manusia  merupakan salah satu hal  penting   untuk  mencapai suatu kesuksesan proyek konstruksi,  karena  keberhasilan  suatu penyedia jasa meliputi  sumber daya manusia juga.  Namun pada pelaksanaannya penyedia  jasa  konstruksi  kurang  memperhatikannya.  Aspek-aspek sumber daya manusia yang dimaksud mencakup  aspek  kompetensi kerja,  motivasi kerja,  loyalitas kerja  serta  disiplin  kerja.  Tujuan  dari  penelitian  ini  yaitu  untuk mendapatkan  seberapa besar   aspek  sumber  daya  manusia  memengaruhi  kinerja  pekerja  proyek  konstruksi agar dapat menciptakan  kinerja pekerja  yang  baik sehingga  kegiatan konstruksi dapat berjalan optimal dan efisien. Penelitian  dilakukan  dengan  penyebaran  kuesioner  dengan menggunakan  teknik  purposive sampling dengan total 30 orang.  Teknik analisis data yang dipakai adalah software SPSS versi 25. Analisis data dilakukan mulai dari uji validitas, uji reliabilitas, uji asumsi klasik yaitu uji normalitas, analisis deskriptif, serta Relative Importance Index (RII). Hasil dari analisis yang dilakukan menunjukkan  bahwa  aspek sumber daya manusia  mmengaruhi kinerja pekerja proyek konstruksi dan yang paling memengaruhi adalah aspek disiplin kerja, kemudian yang  kedua  adalah  aspek  loyalitas , lalu yang  ketiga  adalah  aspek  kompetensi dan yang keempat adalah adalah aspek motivasi.  Dengan  demikian  penyedia jasa  konstruksi  dapat memperhatikan aspek sumber daya manusia  agar dapat memaksimalkan kinerja perkerja.
ANALISIS PENJADWALAN PROYEK GEDUNG BERTINGKAT DENGAN METODE PERT DAN M-PERT MENGGUNAKAN SIMULASI MONTE CARLO Josua Guntur Putra; Jane Sekarsari
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 3, Agustus 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i3.8395

Abstract

One of the keys to success in construction execution is timeliness. In fact, construction is often late than originally planned. It’s caused by project scheduling uncertainty. Deterministic scheduling methods use data from previous projects to determine work duration. However, not every project has same work duration. The PERT method provides a probabilistic approach that can overcome these uncertainties, but it doesn’t account for the increase in duration due to parallel activities. In 2017, the PERT method was developed into the M-PERT method. The purpose of this study is to compare the mean duration and standard deviation of the overall project between PERT and M-PERT methods and compare them in Monte Carlo simulation. The research method used is to calculate the mean duration of the project with the PERT, M-PERT, and Monte Carlo simulation. The study was applied to a three-story building project. From the results of the study, the standard deviation obtained was 5.079 for the M-PERT method, 8.915 for the PERT method, and 5.25 for the Monte Carlo simulation. These results show the M-PERT method can provide closer results to computer simulation result than the PERT method. Small standard deviation value indicates the M-PERT method gives more accurate results.ABSTRAKSalah satu kunci keberhasilan dalam suatu pelaksanaan konstruksi adalah ketepatan waktu. Kenyataannya, pelaksanaan konstruksi sering mengalami keterlambatan waktu dari yang direncanakan. Hal ini disebabkan oleh ketidakpastian dalam merencanakan penjadwalan proyek. Metode penjadwalan yang bersifat deterministik menggunakan data dari proyek sebelumnya untuk menentukan durasi pekerjaan. Akan tetapi, tidak setiap proyek memiliki durasi pekerjaan yang sama. Metode PERT memberikan pendekatan probabilistik yang dapat mengatasi ketidakpastian tersebut, tetapi metode ini tidak memperhitungkan pertambahan durasi akibat adanya kegiatan yang berbentuk paralel. Pada tahun 2017, metode PERT dikembangkan menjadi metode M-PERT. Tujuan dari penelitian ini adalah membandingkan mean durasi dan standar deviasi proyek secara keseluruhan antara metode PERT dan M-PERT dan membandingkan kedua metode tersebut dalam simulasi Monte Carlo. Metode penelitian yang dilakukan adalah menghitung mean durasi proyek dengan metode PERT, M-PERT, dan simulasi Monte Carlo. Penelitian diterapkan pada proyek gedung bertingkat tiga. Dari hasil penelitian, nilai standar deviasi diperoleh sebesar 5,079 untuk metode M-PERT, 8,915 untuk metode PERT, dan 5,25 untuk simulasi Monte Carlo. Hasil ini menunjukan metode M-PERT dapat memberikan hasil yang lebih mendekati hasil simulasi komputer daripada metode PERT. Nilai standar deviasi yang kecil menunjukan metode M-PERT memberikan hasil yang lebih akurat.
ANALISIS KOEFISIEN PEKERJAAN PEMBESIAN PADA KONSTRUKSI GEDUNG BERTINGKAT Eric Leonardy; Jane Sekarsari
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 4, November 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i4.8393

Abstract

Accurate estimate is very necessary before a project run. The goals get a time and money efficiency with good quality. Cost estimation has an important element, namely the coefficient value. There are often problems in calculating prices caused by coefficient values. This study was conducted to find out whether the will gain better than the reference coefficient values in SNI 7394-2008 and PermenPUPR28-2016. Data is taken from 2 studies that discuss the iron fabricating. Processing data into coefficient values using a method known as Time motion and Study, and the calculation get the results that study A has a coefficient ratio of 22,86% and 11,43% in SNI 7394-2008 and PermenPUPR28-2016 while study B gets a coefficient comparison of 468,57% and 234,29% in SNI 7394-2008 and PermenPUPR28-2016. This happens because of the effect of worker productivity and the number of workers used on the data from each study. The results can be concluded that calculating the coefficient value of workers recommended to be done. This is to know whether the coefficient of workers used is more efficient than the coefficient values from references, because the coefficient of workers are not always better than the coefficients in the references. ABSTRAKMelakukan estimasi yang akurat adalah sangat perlu sebelum suatu proyek akan berjalan. Tujuannya  mendapatkan biaya yang kecil, waktu yang cepat, dan mutu yang baik agar proyek berjalan tanpa hambatan. Estimasi biaya memiliki elemen penting, yaitu nilai koefisien. Namun sering terjadi permasalahan pada perhitungan harga yang disebabkan nilai koefisien. Maka studi dilakukan untuk mengetahui apakah nilai koefisien dai pekerja yang digunakan akan menghasilkan nilai yang lebih baik dibandingkan nilai koefisien acuan pada SNI7394-2008 dan PermenPUPR28-2016. Data diambil dari 2 studi yang membahas mengenai pekerjaan pembesian. Kemudian pengolahan data produktivitas menjadi nilai koefisien menggunakan metode yang dikenal dengan Time motion and Study, dan hasil perhitungan mendapatkan hasil bahwa studi A memiliki perbandingan koefisien 22,86% dan 11,43% pada SNI7394-2008 dan PermenPUPR28-2016 sedangkan studi B mendapatkan perbandingan koefisien 468,57% dan 234,29% pada SNI7394-2008 dan PermenPUPR28-2016. Hal ini terjadi karena pengaruh produktivitas pekerja dan jumlah pekerja yang digunakan pada data dari tiap studi. Hasil perhitungan dapat disimpulkan bahwa melakukan perhitungan nilai koefisien pekerja sangat disarankan untuk dilakukan. Hal ini untuk mengetahui apakah nilai koefisien pekerja yang digunakan  lebih efisien dibandingkan nilai koefisien dari acuan yang sudah ada, karena koefisien pekerja yang digunakan belum tentu lebih baik dibandingkan koefisien pada acuan SNI7394-2006 dan PermenPUPR28-2016.