Claim Missing Document
Check
Articles

Found 2 Documents
Search

PERENCANAAN DAN PENGENDALIAN PRODUKSI DENGAN METODE AGGREGATE PLANNING DI C-MAXI ALLOYCAST Atika Khoirun Nisa; Trio Yonathan Tejakusuma
Integrated Lab Journal Vol. 5 No. 2 (2017)
Publisher : UIN Sunan Kalijaga Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (123.255 KB) | DOI: 10.14421/ilj.2017.%x

Abstract

Perencanaan agregat merupakan cara untuk memperkirakan jumlah output yang akan diproduksi untuk memenuhi permintaan selama periode perencanaan (3 sampai 18 bulan) ke depan dan disesuaikan dengan kapasitas produksi perusahaan. Perencanaan agregat memungkinkan perusahaan untuk menyusun suatu cara pemanfaatan sumber daya perusahaan secara optimal, agar dapat mencapai kapasitas yang efektif dan efisien yang dibuat berdasarkan ramalan permintaan di masa yang akan datang. Efektif yang berarti keselarasan antara perencanaan dengan hasil yang didapat, sedangkan efisien berarti mampu memproduksi suatu output tertentu dengan sumber daya yang ada dengan seminimal mungkin. Berdasarkan perhitungan atau perencanaan agregat yang telah dilakukan menggunakan data permintaan dan produksi perusahaan C-MAXI ALLOYCAST periode sebelumnya diketahui bahwa metode yang paling baik yang dapat digunakan dalam proses produksi perusahaan yaitu metode chase strategy, metode ini digunakan dengan cara menambah atau mengurangi jumlah tenaga kerja berdasarkan jumlah permintaan konsumen. Dengan menggunakan chase strategy maka biaya yang dikeluarkan perusahaan lebih sedikit jika diibandingkan dengan metode metode lainnya. Biaya yang dikeluarkan berdasarkan pemilihan metode terbaik untuk produk box listrik sebesar Rp 1.000.272, untuk produk alat rumah sakit sebesar Rp 902.764, dan untuk produk peralatan rumah tangga sebesar Rp 521.892.
Distribution Design of Bottled Mineral Water ‘Airku’ with Distribution Requirement Planning Method (DRP) : (Case Study PDAM Tirta Binangun Kulon Progo) Trio Yonathan Tejakusuma; Atika Khoirun Nisa; Vindy Fitriana Martanti
Journal of Industrial Engineering and Halal Industries Vol. 3 No. 2 (2022): Journal of Industrial Engineering and Halal Industries (JIEHIS)
Publisher : Industrial Engineering Department, Faculty of Science and Engineering, UIN Sunan Kalijaga Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14421/jiehis.3557

Abstract

PDAM Tirta Binangun Kulon Progo is a regional manufacturing company that produce gallon, cup and bottle packing mineral drinking water branded AirKu. The company use multi-echelon distribution network for the distribution system. Common problem that encountered by the company is insufficient or exceeded amount of product as a result of fluctuating demand from Agentt, furthermore the Agentt often find it hard to estimate the exact time for product to arrived. PDAM Tirta Binangun need a reliable model of planning and inventory system, and the method that can be used on their multi-echelon network distribution system is Distribution Requirement Planning (DRP). Distribution Requirement Planning is used to determine distribution activity that depend upon safety stock, lead time, inventory cost, order cost, and demand’s forecast. The model is designed based on lot size that have the optimal cost to determine the gross requirement total, project on hand, net requirement, planned order receipt, planed order release and distribution cost. According to company’s document, interview, and calculation the proper lot is Wagner Within Algorithm, distribution cost paid by Agentt Aneka Usaha is Rp 1.768.076 for AirKu cup, Rp 781.388 for bottle AirKu, and Rp 174.275 for AirKu gallon. Distribution cost paid by Agentt Post Office is Rp 881.630 for AirKu cup, Rp 300.613 for bottle AirKu, and Rp 228.375 for AirKu gallon. Distribution cost paid by Agentt Umar is Rp 1.766. for AirKu cup, Rp 579.325 for bottle AirKu, and Rp 454.256 for AirKu gallon. Distribution cost paid by Agentt Joko Sendang is Rp 1.903.623 for AirKu cup, Rp 656.506 for bottle AirKu, and Rp 189.450 for AirKu gallon.