p-Index From 2020 - 2025
0.444
P-Index
This Author published in this journals
All Journal Bhara Petro Energi
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Evaluasi Water Shut Off Dan Membuka Lapisan Baru Sumur Bagong Di Lapangan Lesma Abdullah Rizky Agusman; Aly Rasyid; Dika Latief Lesmana
JURNAL BHARA PETRO ENERGI Vol 1 No 1: Volume 1 Nomor 1 (Maret 2022)
Publisher : Department of Petroleum Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (593.379 KB) | DOI: 10.31599/bpe.v1i1.1013

Abstract

Evaluation of Water Shut Off and Opening a New Layer of the Bagong Well in the Lesma Field, In oil and gas exploitation activities at the Bg01 Well, the well has been in production for a long time, so there is a problem where the proportion of water content in production wells continues to increase. compared to the proportion of oil and gas content produced, the improvement is carried out using the water shut off method by closing the existing perforation holes and opening new perforations in the same layer. Or closing the existing perforation holes that are indicated to cause an increase in water and the production of other perforated parts. By closing the layer, it is hoped that the water cut will decrease so that it will increase oil and gas production.
Evaluasi Water Shut Off Dan Membuka Lapisan Baru Sumur Bagong Di Lapangan Lesma Abdullah Rizky Agusman; Aly Rasyid; Dika Latief Lesmana
Jurnal Bhara Petro Energi Vol.2 No.1 (Mei 2023)
Publisher : Fakultas Teknik Universitas Bhayangkara Jakarta Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31599/kdnk2h22

Abstract

Evaluation of Water Shut Off and Opening a New Layer of the Bagong Well in the Lesma Field, In oil and gas exploitation activities at the Bg01 Well, the well has been in production for a long time, so there is a problem where the proportion of water content in production wells continues to  increase.  compared  to  the  proportion  of  oil  and  gas  content  produced,  the  improvement  is carried  out  using  the  water  shut  off  method  by  closing  the  existing  perforation  holes  and opening  new  perforations  in  the  same  layer.  Or  closing  the  existing  perforation  holes  that  are indicated to cause an increase in water and the production of other perforated parts. By closing the  layer,  it  is  hoped  that  the  water  cut  will  decrease  so  that  it  will  increase  oil  and  gas production.