Erwin harun
Universitas Tjut Nyak Dhien

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

ANALISIS PENGENDALIAN MANAJEMEN MUTU PROJECT PENINGKATAN JALAN PROPINSI DI SUMATERA UTARA Erwin harun
JURNAL MANAJEMEN DAN BISNIS Vol 6 No 1 (2018)
Publisher : Fakultas Ekonomi Universitas Tjut Nyak Dhien Medan

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (421.401 KB) | DOI: 10.36490/jmdb.v6i1.74

Abstract

The problems that arise in the control of qualitymanagement depart from: a) Weakness quality of human resource in the quality control system will be able to affect the measurement of the quality assurance aspect of the provincial road improvement.b)Quality control is not optimal in the implementation of the quality control of the province.c) Human resource commitmen to the rules relating to the quality, procedure of guidelines applicable low. Studi show that the quality management control road improvement project in North Sumatra province was determined by tri-partied among regulators, owners, contractors and consultants implementing the project and the quality assurance standards of quality and runs with good control.