Studi Alternatif Pengembangan Trase Jalur Kereta Api DAOP VI Yogyakarta Menuju NIYA Kulon Progo Chasanah, Faizul; Putro, Aziz Anjasmoro Harjoko
JTERA (Jurnal Teknologi Rekayasa) Vol 3, No 1: June 2018
Publisher : Politeknik Sukabumi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (519.534 KB) | DOI: 10.31544/jtera.v3.i1.2018.79-88

Abstract

Berdasarkan Keputusan Menteri Perhubungan Nomor KP 1164 Tahun 2013, Bandara Adi Sutjipto Yogyakarta direncanakan pindah ke Kabupaten Kulon Progo karena jumlah penumpang saat ini sudah melebihi daya tampung terminal. Salah satu moda transportasi untuk menunjang aksesibilitas integrasi ini adalah kereta api. Tujuan penelitian ini adalah mengevaluasi alternatif trase penelitian sebelumnya, memberikan alternatif trase baru, dan menentukan trase terbaik. Survei pendahuluan berupa pengamatan langsung di lokasi penelitian untuk mengevaluasi trase penelitian sebelumnya dan mensurvei daerah yang memungkinkan untuk direncanakan alternatif trase baru. Pembobotan kriteria dan pemilihan alternatif trase dilakukan dengan wawancara dan pengisian kuesioner oleh stakeholder dan dianalisis menggunakan metode Analytical Hierarchy Process (AHP). Stakeholder ditentukan dengan teknik purposive sampling yang terdiri dari berbagai instansi terkait. Hasil penelitian menunjukkan bahwa trase yang direncanakan penelitian sebelumnya (Trase A) berpotensi konflik sosial dan tidak sesuai dengan masterplan bandara baru. Alternatif trase baru (Trase B) memiliki panjang trase lebih pendek dan sebagian besar menggunakan lahan pertanian sehingga konflik sosial rendah. Trase terbaik berdasarkan metode AHP adalah Trase B dengan total bobot akhir lebih tinggi daripada total bobot Trase A.  
Studi Alternatif Pengembangan Trase Jalur Kereta Api DAOP VI Yogyakarta Menuju NIYA Kulon Progo Faizul Chasanah; Aziz Anjasmoro Harjoko Putro
JTERA (Jurnal Teknologi Rekayasa) Vol 3, No 1: June 2018
Publisher : Politeknik Sukabumi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31544/jtera.v3.i1.2018.79-88

Abstract

Berdasarkan Keputusan Menteri Perhubungan Nomor KP 1164 Tahun 2013, Bandara Adi Sutjipto Yogyakarta direncanakan pindah ke Kabupaten Kulon Progo karena jumlah penumpang saat ini sudah melebihi daya tampung terminal. Salah satu moda transportasi untuk menunjang aksesibilitas integrasi ini adalah kereta api. Tujuan penelitian ini adalah mengevaluasi alternatif trase penelitian sebelumnya, memberikan alternatif trase baru, dan menentukan trase terbaik. Survei pendahuluan berupa pengamatan langsung di lokasi penelitian untuk mengevaluasi trase penelitian sebelumnya dan mensurvei daerah yang memungkinkan untuk direncanakan alternatif trase baru. Pembobotan kriteria dan pemilihan alternatif trase dilakukan dengan wawancara dan pengisian kuesioner oleh stakeholder dan dianalisis menggunakan metode Analytical Hierarchy Process (AHP). Stakeholder ditentukan dengan teknik purposive sampling yang terdiri dari berbagai instansi terkait. Hasil penelitian menunjukkan bahwa trase yang direncanakan penelitian sebelumnya (Trase A) berpotensi konflik sosial dan tidak sesuai dengan masterplan bandara baru. Alternatif trase baru (Trase B) memiliki panjang trase lebih pendek dan sebagian besar menggunakan lahan pertanian sehingga konflik sosial rendah. Trase terbaik berdasarkan metode AHP adalah Trase B dengan total bobot akhir lebih tinggi daripada total bobot Trase A.  
ANALISIS PENINGKATAN JALAN AKIBAT KERUSAKAN STRUKTUR PERKERASAN DI ATAS TANAH EKSPANSIF Chasanah, Faizul
Teknisia Vol. XX, No. 1, Mei 2015
Publisher : Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Islam Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Performance of pavement structure related to the material and subgrade conditions. This research was conducted to evaluate the damage to the flexible pavement, to analyze the influence of potential and expansive pressure of subgrade, and to analyze pavement thickness of flexible pavement and rigid pavement that has been done by the government in 2012.The location for this research is the road from Purwodadi to Geyer and from km 66+650 to km 87+180. The analysis done with evaluate of the road damage was based on secondary data from Bina Marga department and observation in the field. The early research with taking some soil sample and then testing in laboratory to determine the swelling potentials and swelling pressure by Seed (1962) method. While, the analysis of pavement thickness was designed using the AASHTO (1993) and Bina Marga method. The result of research show the existing condition have ten locations with severely damaged and one location with moderately damaged. Based on the laboratory tests results, the soil condition has a critical expansive degree and high expansive pressure. The average value of expansive degree to all sample show > 10 % and > 300 kPa for expansive pressure. The analysis using AASTHO (1993) method generated additional pavement thickness of 18.5 cm which was required on flexible pavement while the analysis by Bina Marga method produced the required pavement thickness of 23 cm on rigid pavement. Therefore, it can be concluded that overlay in the Purwodadi - Geyer road was not able to serve the traffic based on service life of ten years.
Prediction of pavement condition using markov chain method based on PCI and SDI assessment result Hakim, Indri Nurtiyani; Fauziah, Miftahul; Chasanah, Faizul
Teknisia Vol 30 No 1 (2025): Teknisia
Publisher : Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Islam Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20885/teknisia.vol30.iss1.art4

Abstract

A pavement management system needs to be implemented as a form of road management to ensure that roads function properly. The Markov Chain model describes future pavement conditions to produce optimal highway maintenance. The research was carried out on Suprapto Street, Ahmad Yani Street, and Yos Sudarso Street in Indramayu Regency. Based on road conditions in 2024 by PCI and SDI assessment results, predictions are made by multiplying the initial condition vector by the transition probability matrix. Once the condition of the road is known, the proposed type of maintenance can be determined based on Ministerial Regulation of Public Work No. 13/PRT/M/2011, along with the costs required based on the maintenance cost history. The Markov Chain predictions show that road conditions will deteriorate and there will be an increase in severe damage over the years if no treatment is carried out. Maintenance action patterns vary; sections that experience a high level of damage will receive more serious treatment, and in the following year maintenance will decrease and then increase again according to the level of damage. The pattern of maintenance costs also follows the handling actions taken. Costs in the initial year were the highest, while most costs were spent on Suprapto Street.