Andre Primantyo H., Andre Primantyo
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Kajian Penanganan Sedimentasi Sungai Banjir Kanal Barat Kota Semarang (Study of Sedimentation Mitigation West Floodway Semarang City) Prasetyo, Dani; Dermawan, Very; H., Andre Primantyo
Jurnal Teknik Pengairan: Journal of Water Resources Engineering Vol 6, No 1 (2015)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1198.707 KB)

Abstract

For the flood control of Semarang City,one of part needed is sedimentation mitigation atthe West Floodway river. This study is carried out to predictdistribution patterns and sediment volumein the West Floodway. The simulation of existing conditions is the first step for determination of sediment transport model. The models will be used to predicting sedimentation until year 2019 and 2024 on the condition without and with sediment mitigation alternatives. Based on the existing condition simulation, the average of elevation increase in 2019 and 2024 respectively are 1,864 m and 2,210 m. The estimation of sediment volume in 2019 and 2024 respectively are 1.053.524 m³ and 1.223.693 m³. The results of sediment transport prediction with sediment pocket showing the lowest average elevation in 2019 and 2024 respectively are 1,379 m and 1,992 m.The smallest volume of sediment obtained by dredging with dredger in 2019 and 2024 respectively are 791.161 m³ and 1.099.685 m³. Based on cost estimation,the cost of dredging with dredger is the lowest, at a cost 32.267.637.478 IDR.Keyword: sedimentation, HEC-RAS, prediction, elevation, volume, cost
Analisa Pengendalian Banjir Kali Ciliwung Ruas Jembatan MT. Haryono – Pintu Air Manggarai Zamroni, Fahmi; Sholichin, Moh.; H., Andre Primantyo
Jurnal Teknik Pengairan: Journal of Water Resources Engineering Vol 6, No 1 (2015)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (688.659 KB)

Abstract

Flooding is an annual problem occurs in DKI Jakarta. Generally the cause of flooding in Jakarta happened because of two major factors, the natural factor that flooding is influenced by 13 rivers that cross the DKI Jakarta and the human factor that changes the function areas border the river.In this study made seven simulations of alternative flood control at Ciliwung River segment MT. Haryono to Manggarai Sluice with flood plan discharge 100 years. Furthermore the most optimum alternative is determined taking into account the volume of runoff occurring and the budget plan costs.Based on analysis of the hydraulics and analysis of budget plan costs obtained that the most optimum alternative is the normalization of Ciliwung River segment MT. Haryono to Manggarai Sluice. The volume on the main channel is 1.730.520 m 3 and overflow did not occur. High water level at observation point P-174 and P-1 respectifely are +14,05 m and +8,76 m the average water level lossis 4,57 m with construction costs 694.668.698.520,55 IDR.Keywords :Flood control, Ciliwung River, reduction of overflow, cost.