Jody Martin Ginting
Faculty of Civil Engineering and Planning, Batam International University

Published : 4 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 4 Documents
Search

Tinjauan Kelancaran Arus Lalu Lintas pada Area Bundaran Simpang Barelang di Wilayah Batu Aji Batam dengan Menggunakan Metode Manual Kapasitas Jalan Indonesia 1997 Mada Surya Darmawan; Jody Martin Ginting; Usmanul Hayadi Umar
Jurnal Manajemen Teknologi & Teknik Sipil Vol 5, No 1 (2022): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (3138.977 KB) | DOI: 10.30737/jurmateks.v5i1.2861

Abstract

Smooth transportation conditions can improve population mobility services and other resources that can support economic growth. However, in densely populated cities like Batam, congestion often occurs and causes road users to feel stressed, the pace of the economy is hampered, and a lot of time is wasted. Therefore, it is necessary to review the performance of transportation. The purpose of this study was to determine whether the traffic performance at the Barelang intersection roundabout has been effective against the existing traffic situation in the area. The research was conducted by conducting a traffic survey on the road at the Barelang intersection, Batam to obtain the number of vehicles passing through the Barelang intersection. The reference used in this study is MKJI 1997 with the analysis carried out on road capacity, traffic volume, and degree of saturation. The results obtained at the Barrelang intersection for the road segment from SP Plaza to Muka Kuning has a degree of saturation value of 0.72. As for the road from Muka Kuning to SP Plaza, the degree of saturation is 1.08. Based on MKJI it is determined that the value of the degree of saturation of a road segment should not be more than 0.75, it can be concluded that the road from SP Plaza to Muka Kuning is considered effective and for the road segment from Muka Kuning to SP Plaza it is not effective. The results of this study can be used as a reference in an effort to improve transportation performance.
Optimalisasi Rencana Anggaran Biaya pada Perumahan Central Raya Tiban Menggunakan Perhitungan SNI dan Kontraktor Delvina Luo; Jody Martin Ginting; Amanatullah Savitri
Jurnal Manajemen Teknologi & Teknik Sipil Vol 5, No 1 (2022): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2954.028 KB) | DOI: 10.30737/jurmateks.v5i1.2576

Abstract

In the construction project, construction management is needed in order to get results that are in accordance with the objectives of the development. One of the elements of project management is cost management. Poor cost management can lead to cost overruns or over budgets to the detriment of project owners and contractors. One of the methods that can be used in preparing the project cost budget is the SNI calculation and the contractor's calculation. The purpose of this study was to determine the comparison of the budget plan using the SNI method and the contractor's calculation. The research was conducted by collecting data on the Central Raya Tiban housing development project. Furthermore, an analysis using the SNI and contractor is carried out and compares the results of the calculations of the two methods. The results of the study obtained that the estimated cost budget plan from the calculation of the contractor was Rp. 283,827,332, while the results with the SNI were Rp. 330,333,371. From these data, it can be seen that the contractor's calculation is more optimal when compared to the calculation of SNI with a difference of Rp. 46,506,039 or 14.08% of the total value of the estimated cost budget based on the SNI calculation method. This can be used as a reference in preparing a cost budget in order to reduce development or project costs so that they become optimal and in accordance with the wishes of the project owner.
Optimalisasi Rencana Anggaran Biaya pada Perumahan Central Raya Tiban Menggunakan Perhitungan SNI dan Kontraktor Delvina Luo; Jody Martin Ginting; Amanatullah Savitri
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 5 No. 1 (2022): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v5i1.2576

Abstract

In the construction project, construction management is needed in order to get results that are in accordance with the objectives of the development. One of the elements of project management is cost management. Poor cost management can lead to cost overruns or over budgets to the detriment of project owners and contractors. One of the methods that can be used in preparing the project cost budget is the SNI calculation and the contractor's calculation. The purpose of this study was to determine the comparison of the budget plan using the SNI method and the contractor's calculation. The research was conducted by collecting data on the Central Raya Tiban housing development project. Furthermore, an analysis using the SNI and contractor is carried out and compares the results of the calculations of the two methods. The results of the study obtained that the estimated cost budget plan from the calculation of the contractor was Rp. 283,827,332, while the results with the SNI were Rp. 330,333,371. From these data, it can be seen that the contractor's calculation is more optimal when compared to the calculation of SNI with a difference of Rp. 46,506,039 or 14.08% of the total value of the estimated cost budget based on the SNI calculation method. This can be used as a reference in preparing a cost budget in order to reduce development or project costs so that they become optimal and in accordance with the wishes of the project owner.
Tinjauan Kelancaran Arus Lalu Lintas pada Area Bundaran Simpang Barelang di Wilayah Batu Aji Batam dengan Menggunakan Metode Manual Kapasitas Jalan Indonesia 1997 Mada Surya Darmawan; Jody Martin Ginting; Usmanul Hayadi Umar
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 5 No. 1 (2022): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v5i1.2861

Abstract

Smooth transportation conditions can improve population mobility services and other resources that can support economic growth. However, in densely populated cities like Batam, congestion often occurs and causes road users to feel stressed, the pace of the economy is hampered, and a lot of time is wasted. Therefore, it is necessary to review the performance of transportation. The purpose of this study was to determine whether the traffic performance at the Barelang intersection roundabout has been effective against the existing traffic situation in the area. The research was conducted by conducting a traffic survey on the road at the Barelang intersection, Batam to obtain the number of vehicles passing through the Barelang intersection. The reference used in this study is MKJI 1997 with the analysis carried out on road capacity, traffic volume, and degree of saturation. The results obtained at the Barrelang intersection for the road segment from SP Plaza to Muka Kuning has a degree of saturation value of 0.72. As for the road from Muka Kuning to SP Plaza, the degree of saturation is 1.08. Based on MKJI it is determined that the value of the degree of saturation of a road segment should not be more than 0.75, it can be concluded that the road from SP Plaza to Muka Kuning is considered effective and for the road segment from Muka Kuning to SP Plaza it is not effective. The results of this study can be used as a reference in an effort to improve transportation performance.