The estimated cost of work and K3 construction of retaining walls Richa Rahmalia Sunhadji; Heru Salasa; Ismail; Imanulhaq; Paikun; Novohatko Elena Nivolaevna
INTERNATIONAL JOURNAL ENGINEERING AND APPLIED TECHNOLOGY (IJEAT) Vol. 5 No. 1 (2022): International Journal of Engineering and Applied Technology (IJEAT)
Publisher : Nusa Putra University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (840.673 KB) | DOI: 10.52005/ijeat.v5i1.59

Abstract

One of the methods used to control the stability of the soil so as not to experience a landslide is to build a retaining wall. In carrying out the work, of course, it is necessary to pay attention to occupational safety and health for all those involved in a project, including the community around the project, therefore, it is important to calculate costs before starting work, so that the project can be carried out properly according to regulations, objectives, functions, benefits, impacts, costs, quality, time, and K3 or occupational safety and health. This study aims to determine the cost of retaining a cliff wall using the main material of mountain stone/split stone, including labor costs, materials, tools, and occupational safety and health (K3) costs. This research uses quantitative descriptive method. To complete this research, we need data on the budget plan for the construction project for the construction of retaining walls, and factual costs at the project site. The data sources consist of project documents, contract documents, and direct observations on site. This research has identified the cost of materials, tools, labor, and K3 in units converted to cost/m3, and produced a coefficient of unit price analysis for retaining wall work. The results of this study can contribute to estimating the cost of retaining wall work using mountain/split stone specifications at an early stage during planning, using unit costs/m3 of work, both by planners, contractors and the general public.
Pembuatan Papan Petunjuk Jalan Dusun Di Desa Bencoy Waliyudin; Ismail; Riva Tifanny; Yudi Nata; Samsul Pahmi
Jurnal Pengabdian Kepada Masyarakat Abdi Putra Vol 3 No 2 (2023): Mei 2023
Publisher : Universitas Nusa Putra & Persatuan Insinyur Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52005/abdiputra.v3i2.48

Abstract

Permasalahan yang terjadi di beberapa titik jalan Dusun yang ada didesa Bencoyterdapat beberapa kerusakan jalan yang perlu diperbaiki dan dibutuhkan beberapa plakat atau papan penunjuk jalan keluar masuk desa, plakat petunjuk kantor dan kediaman RT/RW, serta kelurahan serta papan petunjuk tempat ibadah dan fasilitas umum lainnya, plakat batas kecepatan pengendara jalan, dan peta atau denah desa perlu juga dibuat untuk mempermudah warga pendatang ketika masuk ke Desa Bencoy. Kegiatan pengabdian masyarakat ini dimulai dengan mengadakan survey lapangan atau tempat-tempat yang akan dipasang papan petunjuk. Setelah menemukan lokasi yang akan dipasang papan maka langkah selanjutnya adalah membuat plakat atau papan dengan membeli alat serta bahan yang diperlukan. Setelah selesai pembuatan plakat maka dilanjutkan dengan pengecatan yang kemudian dilanjutkan dengan pemasangan plakat yang dilakukan oleh mahasiswa dibantu oleh masyarakat setempat. Papan atau plakat dibuat berjumlah 4 buah. Kegiatan dilaksanakan di Desa Bencoy Kecamatan Cireunghas di 4 dusun yakni Dusun Cilubang, Dusun Cikaso, Dusun Limbangan, dan Dusun Cireunghas ini terlaksana dengan baik atas dukungan dan bantuan warga desa karena hal ini menyangkut kepentingan orang banyak. Tidak ada hambatan yang cukup berarti dalam proses persiapan, pelaksanaan hingga evaluasi kegiatan ini hanya saja proses pengerjaannya membutuhkan waktu yang lumayan lama. Pembuatan dan pemasangan papan atau plakat penunjuk jalan ini adalah sebagai bentuk partisipasi, koordinasi dan keterlibatan aktif baik mahasiswa, dosen dan warga desa sekitar.