Ikral Gapshel
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Performansi Turbin dan Generator di PLTP Lahendong Unit 1 Tomohon La Ode Musa; Abdul Rahman; Ikral Gapshel; Triska Sombokanan
Jurnal Teknik Mesin Sinergi Vol 17, No 1 (2019): April 2019
Publisher : Politeknik Negeri Ujung Pandang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (746.869 KB) | DOI: 10.31963/sinergi.v17i1.1589

Abstract

Lahendong Geothermal power plant is one of the Geothermal power plants in Indonesia which has four units and it be able to generate 4 × 20 MW of electrical energy by utilizing geothermal energy in the form of steam that supplied from wells created by Pertamina. The aim of this study is to determine the performance of the turbine and generator unit 1 which has been operated since 2001 by using thermodynamic analysis method calculating the steam quality and turbine work. Afterwards, turbine efficiency, turbine power and generator power were obtained. The average quality of geothermal steam at Lahendong in 2001 and 2015 were 0.8002 and 0.8065. Turbine’s performance decreased in 2001 (664.021 kJ / kg) until 2015 (640.799 kJ / kg), with the highest generator rotation tolerance of 0.9%.